ZFS1600-16-24掩護(hù)式液壓支架底座、推移千斤頂設(shè)計【優(yōu)秀課程畢業(yè)設(shè)計+含16張CAD圖紙+帶開題報告+中期檢查表+外文翻譯+44頁加正文1.46萬字】-jxsj06

收藏

跳過導(dǎo)航鏈接。
折疊 ZFS1600-16-24掩護(hù)式液壓支架底座、推移千斤頂設(shè)計【優(yōu)秀課程畢業(yè)設(shè)計+含16張CAD圖紙+帶開題報告+中期檢查表+外文翻譯+44頁加正文1.46萬字】-jxsj06.zipZFS1600-16-24掩護(hù)式液壓支架底座、推移千斤頂設(shè)計【優(yōu)秀課程畢業(yè)設(shè)計+含16張CAD圖紙+帶開題報告+中期檢查表+外文翻譯+44頁加正文1.46萬字】-jxsj06.zip
設(shè)計正文.doc---(點擊預(yù)覽)
設(shè)計正文.doc---(點擊預(yù)覽)
開題報告.doc---(點擊預(yù)覽)
開題報告.doc---(點擊預(yù)覽)
外文翻譯.doc---(點擊預(yù)覽)
外文翻譯.doc---(點擊預(yù)覽)
中期檢查表.doc---(點擊預(yù)覽)
中期檢查表.doc---(點擊預(yù)覽)
A0-液壓支架裝配圖.dwg
A1-底座.dwg
A2-千斤頂裝配圖.dwg
A3-活塞桿.dwg
A3-筒.dwg
A3-缸體.dwg
A3-缸底.dwg
A3-缸筒.dwg
A4-內(nèi)導(dǎo)向環(huán).dwg
A4-半環(huán).dwg
A4-卡鍵.dwg
A4-壓盤.dwg
A4-導(dǎo)向套.dwg
A4-擋套.dwg
A4-接頭.dwg
A4-活塞.dwg
A0-液壓支架裝配圖.dwg
A1-底座.dwg
A2-千斤頂裝配圖.dwg
A3-活塞桿.dwg
A3-筒.dwg
A3-缸體.dwg
A3-缸底.dwg
A3-缸筒.dwg
A4-內(nèi)導(dǎo)向環(huán).dwg
A4-半環(huán).dwg
A4-卡鍵.dwg
A4-壓盤.dwg
A4-導(dǎo)向套.dwg
A4-擋套.dwg
A4-接頭.dwg
A4-活塞.dwg
壓縮包目錄 預(yù)覽區(qū)
  • 全部
    • A0-液壓支架裝配圖.dwg
    • A1-底座.dwg
    • A2-千斤頂裝配圖.dwg
    • A3-活塞桿.dwg
    • A3-筒.dwg
    • A3-缸體.dwg
    • A3-缸底.dwg
    • A3-缸筒.dwg
    • A4-內(nèi)導(dǎo)向環(huán).dwg
    • A4-半環(huán).dwg
    • A4-卡鍵.dwg
    • A4-壓盤.dwg
    • A4-導(dǎo)向套.dwg
    • A4-擋套.dwg
    • A4-接頭.dwg
    • A4-活塞.dwg
    • 中期檢查表.doc--點擊預(yù)覽
    • 外文翻譯.doc--點擊預(yù)覽
    • 開題報告.doc--點擊預(yù)覽
    • 設(shè)計正文.doc--點擊預(yù)覽
請點擊導(dǎo)航文件預(yù)覽
編號:59694    類型:共享資源    大?。?span id="btd79zh" class="font-tahoma">929.91KB    格式:ZIP    上傳時間:2017-06-02
49
積分
關(guān) 鍵 詞:
zfs1600 16 24 掩護(hù) 液壓 支架 底座 推移 千斤頂 設(shè)計 液壓支架 掩護(hù)式 推移千斤頂
資源描述:

ZFS1600/16/24掩護(hù)式液壓支架底座、推移千斤頂設(shè)計【優(yōu)秀課程畢業(yè)設(shè)計+含16張CAD圖紙+帶開題報告+中期檢查表+外文翻譯+44頁加正文1.46萬字】

【詳情如下】【需要咨詢購買全套設(shè)計請加QQ1459919609】

A0-液壓支架裝配圖.dwg

A1-底座.dwg

A2-千斤頂裝配圖.dwg

A3-活塞桿.dwg

A3-筒.dwg

A3-缸體.dwg

A3-缸底.dwg

A3-缸筒.dwg

A4-內(nèi)導(dǎo)向環(huán).dwg

A4-半環(huán).dwg

A4-卡鍵.dwg

A4-壓盤.dwg

A4-導(dǎo)向套.dwg

A4-擋套.dwg

A4-接頭.dwg

A4-活塞.dwg

中期檢查表.doc

外文翻譯.doc

開題報告.doc

文件清單.txt

設(shè)計正文.doc

液壓支架底座及推移千斤頂設(shè)計

ZFS1600/16/24掩護(hù)式液壓支架底座、推移千斤頂設(shè)計

摘要

    本課題主要論述了液壓支架的主要設(shè)計過程。其中包括:液壓支架的選型、總體設(shè)計、主要零部件的設(shè)計以及液壓系統(tǒng)設(shè)計。

支架的形式為掩護(hù)式支架。支架除了要有效的對頂板進(jìn)行支撐外,還要實現(xiàn)升、降、推、移幾個步驟。支架采用四連桿機構(gòu),改善支架的受力狀況,縮小支架的升降過程中頂梁前端前后移動的距離。立柱采用單伸縮液壓缸,前端帶有加長桿,以滿足支架最低及最高位置時的高度要求。頂梁掩護(hù)梁、底座都做成箱體結(jié)構(gòu)用鋼板焊接而成。

在研制液壓支架時,需要對支架進(jìn)行生產(chǎn)試驗和分析研究,確定合理的液壓支架受力參數(shù)、運動參數(shù)和結(jié)構(gòu)參數(shù),以及選定液壓支架最佳方案等方面綜合性的科學(xué)技術(shù)問題。

關(guān)鍵詞:液壓支架;頂梁;底座;立柱;結(jié)構(gòu)設(shè)計    

ABSTRACT

The article mainly elaborate the hydraulic support design for top-caving. including: the selection of hydraulic pressure support form, system design, main spar part design and examination of hydraulic system design.

The support eliminates must realize effectively carries on the strut to the roof, but also must realize ,to fall, to push, move four steps .the support uses four link motion gears, improves the support the stress condition, reduces the support to rise and full the distance which in the process fort end the top-beam around moves. The column uses the list expansion and contraction hydraulic cylinder, front end has legthen the pole, satisfies the support to be lowest and time the highest position high request. The top-beam, shields Liang, the foundation all makes the packed in a box body structure, becomes with the steel plate welding.

    At research to presses the support, need to carry on produce to experiment and analyze the research, make sure reasonable of liquid presses the support to be subjected to the dint parameter, the sport parameter and the structure parameters, and make selection the liquid to press the synthetic science technique problem of aspect of etc. of the best project of support. 

Keyword: Hydraulic pressure support;Top beam;Cradle;the column-type support;structure design

目錄

摘要 I

ABSTRACT II

目錄 1

1緒  論 1

1.1前言 1

1.2本課題的研究目的和意義 2

2液壓支架基本理論分析 4

2.1 液壓支架的工作原理 4

2.1.1 支架推移 4

2.1.2支架升降 5

2.1.3 支架承載過程 5

2.2 液壓支架的類型和結(jié)構(gòu) 7

2.2.1 掩護(hù)式支架 7

2.2.2 支撐式支架 8

2.2.3 支撐掩護(hù)式支架 8

2.2.4 特種液壓支架 9

  2.3 對液壓支架的基本要求 9

  2.4 支架的選型設(shè)計 10

2.4.1設(shè)計的原始條件 10

2.4.2支架的支護(hù)性能與外載荷 10

2.4.3 影響架型選擇的因素 11

2.4.4 支架架型的確定 12

3 液壓支架的整體結(jié)構(gòu)設(shè)計 14

3.1 支架高度、中心距的確定 14

3.1.1支架高度 14

3.1.2支架伸縮比 14

3.1.3支架間距 14

3.2底座長度的確定 15

3.2.1底座長度 15

3.2.2 底座寬度 15

4支架主要部件的設(shè)計 16

4.1支架主要部件的設(shè)計要求 16

4.2底座的設(shè)計 17

4.2.1液壓支架的底座 17

4.2.2 底座接觸比壓 17

4.3千斤頂技術(shù)參數(shù)的確定 18

4.3.1推移千斤頂 18

5 支架受力分析與計算 20

5.1支架工作狀態(tài) 20

5.1.1 頂板狀態(tài) 20

5.1.2支架工作狀態(tài) 20

5.1.3支架受力 21

5.2受力計算 21

6 液壓系統(tǒng)設(shè)計 25

6.1液壓支架的液壓系統(tǒng)特點 25

6.2 液壓系統(tǒng)的設(shè)計方法 26

6.3 千斤頂系統(tǒng) 26

6.3.1. 推移千斤頂系統(tǒng) 27

6.4乳化液泵站系統(tǒng) 28

6.4.1乳化液泵站 28

6.4.2泵站液壓系統(tǒng) 29

6.4.3乳化液泵站的元部件 32

7技術(shù)經(jīng)濟(jì)分析 35

8結(jié)論 36

致謝 37

參 考 文 獻(xiàn) 38


展開閱讀全文
溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
提示  裝配圖網(wǎng)所有資源均是用戶自行上傳分享,僅供網(wǎng)友學(xué)習(xí)交流,未經(jīng)上傳用戶書面授權(quán),請勿作他用。
關(guān)于本文
本文標(biāo)題:ZFS1600-16-24掩護(hù)式液壓支架底座、推移千斤頂設(shè)計【優(yōu)秀課程畢業(yè)設(shè)計+含16張CAD圖紙+帶開題報告+中期檢查表+外文翻譯+44頁加正文1.46萬字】-jxsj06
鏈接地址:http://italysoccerbets.com/p-59694.html

相關(guān)資源

更多
正為您匹配相似的精品文檔
關(guān)于我們 - 網(wǎng)站聲明 - 網(wǎng)站地圖 - 資源地圖 - 友情鏈接 - 網(wǎng)站客服 - 聯(lián)系我們

copyright@ 2023-2025  zhuangpeitu.com 裝配圖網(wǎng)版權(quán)所有   聯(lián)系電話:18123376007

備案號:ICP2024067431-1 川公網(wǎng)安備51140202000466號


本站為文檔C2C交易模式,即用戶上傳的文檔直接被用戶下載,本站只是中間服務(wù)平臺,本站所有文檔下載所得的收益歸上傳人(含作者)所有。裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對上載內(nèi)容本身不做任何修改或編輯。若文檔所含內(nèi)容侵犯了您的版權(quán)或隱私,請立即通知裝配圖網(wǎng),我們立即給予刪除!