17變速箱上蓋加工工藝編制及夾具設(shè)計(jì)【鉆底孔】【銑φ400端面】【說(shuō)明書(shū)+CAD】
購(gòu)買(mǎi)設(shè)計(jì)請(qǐng)充值后下載,資源目錄下的文件所見(jiàn)即所得,都可以點(diǎn)開(kāi)預(yù)覽,資料完整,充值下載可得到資源目錄里的所有文件?!咀ⅰ浚篸wg后綴為CAD圖紙,doc,docx為WORD文檔,原稿無(wú)水印,可編輯。具體請(qǐng)見(jiàn)文件預(yù)覽,有不明白之處,可咨詢(xún)QQ:12401814
湖南科技大學(xué)機(jī)械加工工藝過(guò)程卡片產(chǎn)品型號(hào)零件圖號(hào)資料編號(hào)產(chǎn)品名稱(chēng)上箱體零件名稱(chēng)上箱體共1頁(yè)第1頁(yè)材 料 牌 號(hào)HT200毛 坯 種 類(lèi)鑄造毛坯外形尺寸每毛坯件數(shù)1每 臺(tái) 件 數(shù)1備 注 工 序 號(hào) 工 名 序 稱(chēng)工 序 內(nèi) 容 車(chē) 間 工 段設(shè) 備工 藝 裝 備工 時(shí) 10 鑄 鑄造20 清砂 清砂,澆冒口30熱處理 人工時(shí)效處理40 涂漆 非加工表面涂防銹漆50銑 以頂面為粗基準(zhǔn),粗銑結(jié)合面,留加工余量2mm機(jī)加工銑床 立式銑床0.550.08360銑 以結(jié)合面為基準(zhǔn),裝夾工件,粗銑上頂面,留加工余量0.40.5mm機(jī)加工銑床 立式銑床0.550.08370鉆 結(jié)合上下箱體鉆2個(gè)定銷(xiāo)孔機(jī)加工鉆床立式鉆床Z5250.250.037580鉆 以結(jié)合面定位,裝夾工件,用專(zhuān)用鉆模,按底面外形找正1418mm孔锪1432mm,鉆、攻放油孔M20內(nèi)螺紋,锪平面40mm .鉆鉸212mm和1:50錐度銷(xiāo)孔.機(jī)加工鉆床 立式銑床Z5250.160.02490鉗 將箱蓋、箱體做標(biāo)記、編號(hào) ,將箱蓋、箱體對(duì)準(zhǔn)合箱,用6M16螺栓、螺母緊固機(jī)加工100鏜以底面定位裝夾工件,按分割面高度中心線(xiàn)找正鏜桿中心高,按線(xiàn)找正孔的位置,精鏜軸承孔,留精鏜余量0.50.6mm,刮兩端面機(jī)加工鏜床 硬質(zhì)合金鏜刀。鏜刀材料YT50.110.0165110精鏜 精鏜 mm軸承孔至圖樣尺寸,精刮兩端面機(jī)加工鏜床 硬質(zhì)合金鏜刀。鏜刀材料YT50.260.039120鏜 以底面及軸承孔(軸承孔裝上心軸)定位,軸承孔一端面定向,裝夾工件,鏜一側(cè)mm 至圖樣尺寸,刮削端面。用同樣裝夾方法,重新裝夾工件,鏜另一側(cè)缸mm至圖樣尺寸,刮削端面機(jī)加工鏜床硬質(zhì)合金鏜刀。鏜刀材料YT50.250.039130銑 以底面定位,裝夾工件(專(zhuān)用工裝或組合工具),銑平面機(jī)加工銑床 面銑刀(硬質(zhì)合金材料)0.550.0825140鉆 鉆攻端面上各20M12螺孔,鉆、攻端面3 M32螺孔機(jī)加工鉆床150倒角各螺紋孔處倒角145,主軸孔出倒角245,其余軸孔倒角145,其余各處需倒角部位倒角145機(jī)加工鉆床160檢查檢查孔端面與軸承孔軸心線(xiàn)的平行度,缸孔端面與缸孔軸心線(xiàn)的垂直度及各部尺寸及精度機(jī)加工二專(zhuān)用檢具170鉗煤油滲漏試驗(yàn) 檢驗(yàn)180檢驗(yàn)檢查各部尺寸檢驗(yàn) 設(shè) 計(jì)(日 期) 校 對(duì)(日期) 審 核(日期) 標(biāo)準(zhǔn)化(日期) 會(huì) 簽(日期)標(biāo)記處數(shù)更改文件號(hào)簽 字 日 期標(biāo)記處數(shù)更改文件號(hào)簽 字 日 期 The United States The Allison Liquid Dint Spread To Move To Become Soon A Box An Examination Experiment The Set Develop With ApplicationAbstract: Article analysis Allison in the United States become soon box structure, work principle and function characteristics, developped liquid dint to spread to move to become soon box examination experiment set, introduction become soon box big fix to solve in the process of key problem.Keywords: The Allison become soon box; The examination experiment Taiwan; Develop; Application1. IntroductionAlong with society economy of fly soon development, the liquid dint spread to move to become soon a box gradual replaced a machine type to spread move of common become soon box.According to investigate, the United States Alli2 son etc. the liquid dint spread to move to become soon box market dosage very big, but its price be expensive, structure complications, fix a technique content Gao, break down judgment difficulty big, and still demand examination experiment the pedestal arouse operation, examination the liquid dint spread to move to become soon a box of hydraulic-pneumatic, turn soon, temperature etc., acceptance various technique parameter, judgment expel break down.But want to purchase a set an examination an equipments demand investment more than 10000 dollars 200.For the sake of economy availably exaltation the liquid dint spread to move to become soon a box to fix speed and quality and expand big northwest of fix a market, long celebrate petroleum to investigate to explore a bureau three service center machine of the oil extraction techniques to maintain station by oneself design manufacturing the ZF, Allison liquid dint spread to move to become soon a box examination experiment set etc. the work pack an equipments, and devotion the liquid dint spread to move to become soon a box fix usage medium;Development Germany ZF, the United States the Allison liquid dint spread to move to become soon a box to fix a craft technique, success fixed ZF, Allison to become box soon take burden examination experiment empress install to fix well on board devotion fix well usage.The United States the Allison liquid dint spread to move to become soon a box examination experiment develop of pedestal, make the liquid dint after fix spread to move to become soon the box can pass examination experiment the pedestal take burden examination experiment, acceptance technique parameter, judgment expel break down, analysis application effect etc.Request develop of the liquid dint spread to move to become soon a box examination experiment set in time accurately reflection quilt examination the liquid dint spread to move to become soon a box of each item technique parameter, include examination acceptance various block one hydraulic-pneumatic, lubricate hydraulic-pneumatic, turn soon, torque, temperature etc. technique parameter, judgment expel difference ring, reveal a clutch, make to move a machine, clutch dozen slippery, return to a can not compare with etc. break down.For making the liquid dint spread to move to become soon box examination experiment set design reasonable, insure big fix examination to experiment behind of the liquid dint spread to move to become soon a box work steady, function stability, safety credibility, we first research the liquid dint spread to move to become soon the structure, function of the box and work principle.2 Become soon box structure and work principleAllison in the United States become soon the box be main from change to twist a machine and shut lock clutch, planet wheel gear and clutch, liquid dint gearbox to constitute.(1).Change to twist a machine: From the pump round, turbine, lead a round to constitute a circulation circle system, liquid in proper order pass circulation to flow.Pump round from launch machine to drive, is a motive importation component.The turbine is through liquid dint spread to move by the pump round, is a power output component.The function which lead a round lead to flow and enlarge to twist Ju.The gearbox provide an oil pump continuously to change the Ju machine provide oil and make to change Ju machine work, increment launch machine of output twist Ju.The oil which pass to change a Ju machine to eject take calories of change the Ju machine.Liquid from pump by turn go into turbine change direction.Leading a round will from the turbine run off of oil through oil way change direction empress again inflow pump round, so lead a round to be subjected to an adverse effect twist Ju.Turbine and pump round twist Ju ratio for change Ju ratio, with turn of turbine and pump round soon ratio lower but enlarge, with output turn soon of exaltation, change Ju ratio lower.Passing to change a Ju machine, outputting to turn soon can have no class variety, drive to twist Ju auto the orientation need of load twist Ju.When the turbine turn to soon attain a pump to rotate soon of the turbine twist Ju to equal pump round to twist Ju and change at this time Ju machine equal to 1 accidentally match a machine.When the car soon go up, change Ju ratio close 1, and lead dint to no longer enlarge, shut lock clutch auto shut lock.(2).Shut lock clutch(CT type and CBT type excepted):be the turbine go up certain turn soon, liquid pressure auto pair of pump round and turbine lock live.Become soon while shut the function of lock clutch box importation stalk of turn soon with launch machine homology.(3)Planet wheel gear and clutch:The four sets of planet rows wheel gears creation is five headway file and 1 to pour file.The planet wheel gear manipulate through six clutch that the liquid press a coalescence.All wheel gear for often the Nie match type.(4)Liquid dint gearbox:CBT and CLBT754 type become soon the box have liquid dint gearbox.Liquid dint gearbox top have a take leafs slice of turn son and two take leafs slice of settle son to constitute.(5) Block and coalescence clutch:Empty block:one file clutch, 2 file clutches.Go forward file:one file and one file clutch, 2 files and 2 file clutches, 3 files and 3 file clutches, 4 files and 4 file clutches, 5 files and 5 file clutches.Pour file:5 file with one file clutch, 5 files with 2 file clutches.3.The liquid dint spread to move to become soon a box a function characteristicsIn the equal work under the condition, with common become soon the box compare, usage the liquid dint spread to move to become soon a box can stanza oil 5% be 22%.And operation simple, usage convenience, function credibility.Launch machine and spread service life of move the system and launch the motive, economy of the machine and the safety function effect of the vehicle equipments to show Zhao very to the exaltation.The Allison liquid dint in the United States spread to move to become soon a box a which is 1 kind to be located on motive machine and work machine of take liquid as a work to lie the fluid of quality to spread to move a machine, and according to load power of variety to realization become soon.In the meantime, according to material of demand can allocation cent move a box brief name Christian Trinity box.Control part at will sex be strong, can constitution the machine control, electricity control, spirit control, the liquid control system and equip.Can according to need constitution to realization auto become soon.Its adaptability is strong and also to have to lead to carry protection function etc.BE exactly because of this kind of many precious characteristics which spread to move part to have in spread moving function, make it get day by day extensive of application.And regardless it application of a realm still its product sale, all increase with each passing day of trend, its development foreground very vast.4.The liquid dint spread to move to become soon a box examination to experiment a set to developFor the exaltation liquid dint spread to move to become a fix of box speed soon, insure to fix quality, we developped liquid dint to spread to move to become soon box examination experiment set etc. the work equip have.4.1 whole conceive outline a designOwing to drive examination the liquid dint spread to move to become soon a box a control part at will sex be strong, as a result can constitution become electricity to control, the liquid control, spirit control or machine control.Its equipments turn to is main examination pressure, we acquired necessary material locally design total size is long 3. 65 m, breadth 0. 7 m, Gao 1. The liquid dint with 9 m spread to move to become soon a box examination to experiment Taiwan.Be suitable for to install examination Allison or ZF etc. various size, model number dissimilarity of the liquid dint spread to move to become soon a box.4.2 control systems and work principleIn the liquid dint spread to move to become a box an examination soon experiment pedestal control plank operation on the stage constitution six big control system:power supply control system, SVF(change the Pin adjust soon) control the system, liquid press control system, ZF control system, Allison control system, load regulate system, gather electricity to control, the liquid control, spirit control, the machine control for the integral whole, examination the function be well-found, shape beauty, operation simple, try movement safety credibility. Power supply control system:the control change the Pin adjust soon a machine, electrical engineering, liquid to press and the ZF, Allison etc. be each control the power supply need by system. SVF(change the Pin adjust soon) control system:main from SVF- 400 change the Pin adjust soon a machine to constitute, control 55 kW,The electrical engineering of 2950 r/ min turn soon, make the electrical engineering turn to can arbitrarily regulate soon in the provision turn soon the scope, the realization become soon box dissimilarity block a become of soon.Turned soon watch to is clear at a glance at any time a reflection the dissimilarity of the electrical engineering to turn soon. Liquid press control system: is become soon box auto encourage, change oil system, can also seal completely inside examination clutch whether piece reveal or not.It is pressed four valve, 4 KW electric motor, fuel tank, liquid of pump, 3 by the liquid to press pipelines etc. to constitute.Hydraulic-pneumatic plankTop of oil pressure gauge clearly reflection block one hydraulic-pneumatic hydraulic-pneumatic with system. ZF control system:main become for the control ZF box soon block of conversion, design a set of procedure. Allison: The HT750 Allison in DR the United States become soon the box have 7 to block, namely D5, D4, D3, D2, D1, N, R.According to generator load the variety of the power realization become soon become of box soon. Load control system:main examination become soon box of output power, from power form, load control the cabinet, generator.etc. constitute. Spirit road and oil road control:spirit the road is soon main control to become the box shift gear organization, oil road control become soon box of performance organization, be also rub slice with make to move a combine of machine or separate.5 Conclusion:The Allison become soon the box be big to fix to solve in the process of key problemThe well next three company HT750 DR the United States the Allison become soon the box pass disintegration check detection existence the following problem: (1)Note the oil pump drive a wheel gear dozen to drop, the metals end drop into become soon box oil bottom hull;1- 5 file clutches rub a slice to wear away;Shut the lock clutch rub a slice to wear away.We will cant repair of note oil pump, push bearings, lead bridge wheel gear and bearings, drive wheel gear and all rub slice, seal completely a piece and filter Xin to carry on replace, assemble each cent total become again construction become become soon box.Put clean become soon box oil, tie up good the outside Lou oil way, use fix fix steady.Will become soon box total become install to arrive an examination experiment on the stage, press test the norm carry on adjusting to try and come to an index sign request.Make to move a machine work normal, just like ring, reveal, success devotion fix well usage.(2) The well next two company fix Allison in DR the United States of the well machine HT750 to become soon box temperature to lead Gao, pressure lead low.At the disintegration install to fix well after fix on board, change the Ju machine leak oil till to launch the machine flywheel hull body, make to launch the machine flywheel hull oil to go up, the pressure go up and result in flywheel hull the oil seal leak oil.Because leak oil to several times dismantle to unload a check justDetection this set become soon change of box the Ju machine outer shell crack.Get on the car after re- weldingThe bed process good, break down can expel.(3) Fix the company CLT754 especially the United States the Allison become soon box disintegration check hour detection problem being more: Note an oil pump wheel gear loose bearings in the Kuang damage;Two file pistons sell pillar to break Sun 1;Medium the seniority star wheel gear loose mineral;Turn soon a form stalk head to wear away;Shut lock backboard and(rhombus) key wear away;The principal axis(take a wheel gear flower key) stalk head wear away;Take dint bearings, shut a lock to rub a slice and each go forward file steel slice, rub slice, seal completely a piece damage.We replace medium seniority star total become etc. total become piece or accessories 91, processed repair to note an oil pump total become, principal axis, flywheel total become, shut lock backboard, one file piston etc., expel break down, solved existence of problem.Construction adjust to try to complete, send produce to front install to fix well on board devotion fix well usage.(4) Wells descending the two greatest brigades CLT754 the United States Allison to become soon a box speed is soonlow, temperature Gao, shut lock clutch dozen slippery, rub slice and steel slice wear away.Pass to dismantle each file of check detection friction slice and steel slice, seal completely a piece and push dint bearings damage.We replaced to seal completely a piece big fix pack, each file rub slice and steel slice, push bearings etc. is 68, construction adjust to try to complete, install to fix well on board devotion fix well usage.美國(guó)Allison 液力傳動(dòng)變速箱檢測(cè)試驗(yàn)臺(tái)研制與應(yīng)用摘要: 文章分析了美國(guó)Allison 變速箱結(jié)構(gòu)、工作原理及性能特點(diǎn),研制了液力傳動(dòng)變速箱檢測(cè)試驗(yàn)臺(tái),介紹了變速箱大修過(guò)程中解決的主要問(wèn)題。 關(guān)鍵詞: Allison 變速箱; 檢測(cè)試驗(yàn)臺(tái); 研制; 應(yīng)用1 引言隨著社會(huì)經(jīng)濟(jì)的飛速發(fā)展 ,液力傳動(dòng)變速箱逐漸取代了機(jī)械式傳動(dòng)的普通變速箱。據(jù)調(diào)查,美國(guó)Allison 等液力傳動(dòng)變速箱市場(chǎng)用量很大 ,但其價(jià)格昂貴、結(jié)構(gòu)復(fù)雜、修理技術(shù)含量高、故障判斷難度大 ,而且還需要檢測(cè)試驗(yàn)臺(tái)帶動(dòng)運(yùn)轉(zhuǎn) ,檢測(cè)液力傳動(dòng)變速箱的油壓、轉(zhuǎn)速、溫度等 ,錄取各種技術(shù)參數(shù) ,判斷排除故障。而要購(gòu)買(mǎi)一臺(tái)檢測(cè)設(shè)備需要投資200 多萬(wàn)元。為了經(jīng)濟(jì)有效地提高液力傳動(dòng)變速箱修理速度和質(zhì)量 ,開(kāi)拓大西北的修理市場(chǎng) ,長(zhǎng)慶石油勘探局第三采油技術(shù)服務(wù)處機(jī)械維修站自行設(shè)計(jì)制造了ZF 、Allison 液力傳動(dòng)變速箱檢測(cè)試驗(yàn)臺(tái)等工裝設(shè)備 ,并投入了液力傳動(dòng)變速箱修理使用中;開(kāi)發(fā)了德國(guó)ZF 、美國(guó)Allison 液力傳動(dòng)變速箱修理工藝技術(shù) ,成功修理了ZF 、Allison 變速箱 ,帶負(fù)荷檢測(cè)試驗(yàn)后安裝到修井機(jī)上投入了修井使用。美國(guó)Allison 液力傳動(dòng)變速箱檢測(cè)試驗(yàn)臺(tái)的研制 , 使修理后的液力傳動(dòng)變速箱能夠通過(guò)檢測(cè)試驗(yàn)臺(tái)帶負(fù)荷檢測(cè)試驗(yàn) ,錄取技術(shù)參數(shù)、判斷排除故障,分析應(yīng)用效果等。要求研制的液力傳動(dòng)變速箱檢測(cè)試驗(yàn)臺(tái)及時(shí)準(zhǔn)確地反映被檢測(cè)液力傳動(dòng)變速箱的各項(xiàng)技術(shù)參數(shù) , 包括檢測(cè)錄取各種擋位油壓、潤(rùn)滑油壓、轉(zhuǎn)速、扭力、溫度等技術(shù)參數(shù) ,判斷排除異響、泄露離合器、制動(dòng)器、離合器打滑、回位不及時(shí)等故障。為了使液力傳動(dòng)變速箱檢測(cè)試驗(yàn)臺(tái)設(shè)計(jì)合理 ,確保大修檢測(cè)試驗(yàn)后的液力傳動(dòng)變速箱工作平穩(wěn)、性能穩(wěn)定、安全可靠 ,我們首先研究了液力傳動(dòng)變速箱的結(jié)構(gòu)、性能及工作原理。2 變速箱結(jié)構(gòu)及工作原理美國(guó)Allison 變速箱主要由變矩器、閉鎖離合器、行星齒輪和離合器、液力變速器組成。(1)變矩器: 由泵輪、渦輪、導(dǎo)輪組成一個(gè)循環(huán)圓系統(tǒng) ,液體順序通過(guò)循環(huán)流動(dòng)。泵輪由發(fā)動(dòng)機(jī)驅(qū)動(dòng) ,是動(dòng)力輸入元件。渦輪由泵輪經(jīng)過(guò)液力傳動(dòng) ,是動(dòng)力輸出元件。導(dǎo)輪的作用是導(dǎo)流 ,增大扭矩。變速器的供油泵不斷向變矩器供油,使變矩器工作 ,增加發(fā)動(dòng)機(jī)的輸出扭矩。通過(guò)變矩器排出的油帶走變矩器的熱量。液體由泵輪流入渦輪改變方向。導(dǎo)輪將從渦輪流出的油經(jīng)油道改變方向后再流入泵輪 ,因此導(dǎo)輪受一反作用扭矩。渦輪與泵輪扭矩比為變矩比,隨渦輪與泵輪的轉(zhuǎn)速比降低而增大 ,隨輸出轉(zhuǎn)速的提高,變矩比降低。通過(guò)變矩器 ,輸出轉(zhuǎn)速可無(wú)級(jí)變化 ,驅(qū)動(dòng)扭矩自動(dòng)適應(yīng)所需的負(fù)載扭矩。當(dāng)渦輪轉(zhuǎn)速達(dá)到泵輪轉(zhuǎn)速的渦輪扭矩等于泵輪扭矩 ,此時(shí)變矩器相當(dāng)于一個(gè)偶合器。 當(dāng)車(chē)速升高,變矩比接近 1 ,且牽引力不再增大時(shí),閉鎖離合器就自動(dòng)閉鎖。(2)閉鎖離合器(CT型和CBT型除外):當(dāng)渦輪升高到一定轉(zhuǎn)速時(shí),液壓力自動(dòng)把泵輪和渦輪鎖住。在閉鎖離合器的作用下 ,變速箱輸入軸的轉(zhuǎn)速和發(fā)動(dòng)機(jī)相同。(3)行星齒輪和離合器:四組行星排齒輪產(chǎn)生五個(gè)前進(jìn)檔和一個(gè)倒檔。行星齒輪通過(guò)六個(gè)液壓接合的離合器操縱。全部齒輪為常嚙合式。(4)液力變速器:CBT和CLBT754 型的變速箱裝有液力變速器。液力變速器上有一個(gè)帶葉片的轉(zhuǎn)子和兩個(gè)帶葉片的定子組成。(5) 擋位和接合離合器:空擋:1檔離合器、2檔離合器。前進(jìn)檔:1檔和 1檔離合器、2 檔和 2檔離合器、3檔和 3 檔離合器、4 檔和4檔離合器、5檔和5檔離合器。倒檔:5 檔和 1 檔離合器、5 檔和2 檔離合器。3.液力傳動(dòng)變速箱性能特點(diǎn)在同等工況下 ,與普通變速箱相比,使用液力傳動(dòng)變速箱可節(jié)油5 %22 % 。而且操作簡(jiǎn)單 ,使用方便 , 性能可靠。對(duì)提高發(fā)動(dòng)機(jī)以及傳動(dòng)系統(tǒng)的使用壽命、發(fā)動(dòng)機(jī)的動(dòng)力性、經(jīng)濟(jì)性和車(chē)輛設(shè)備的安全性能效果十分顯著。美國(guó)Allison 液力傳動(dòng)變速箱是一種位于動(dòng)力機(jī)與工作機(jī)之間的以液體為工作介質(zhì)的流體傳動(dòng)機(jī)械 ,并根據(jù)負(fù)載功率的變化來(lái)實(shí)現(xiàn)變速。同時(shí),根據(jù)裝備的需要可配置分動(dòng)箱 簡(jiǎn)稱(chēng)三位一體箱子。控制部分隨意性強(qiáng),可設(shè)置機(jī)控、電控、氣控、液控系統(tǒng)及裝置。可按需求設(shè)置來(lái)實(shí)現(xiàn) 自動(dòng)變速。它本身適應(yīng)性強(qiáng),還具備了過(guò)載保護(hù)性能等。正是由于這種傳動(dòng)部分在傳動(dòng)性能上具有的諸多寶貴特點(diǎn),使之得到了日益廣泛的應(yīng)用。而且無(wú)論其應(yīng)用的領(lǐng)域還是其產(chǎn)品銷(xiāo)售方面 ,都有與日俱增的趨勢(shì) ,其發(fā)展前景頗為廣闊。4.液力傳動(dòng)變速箱檢測(cè)試驗(yàn)臺(tái)研制為提高液力傳動(dòng)變速箱的修理速度,確保修理質(zhì)量,我們研制了液力傳動(dòng)變速箱檢測(cè)試驗(yàn)臺(tái)等工裝設(shè)備。4. 1 整體構(gòu)思設(shè)計(jì)鑒于被檢測(cè)液力傳動(dòng)變速箱控制部分隨意性強(qiáng),因而可設(shè)置成電控、液控、氣控或機(jī)械控制。該設(shè)備主要檢測(cè)壓力,我們就地取材設(shè)計(jì)了總體尺寸為長(zhǎng)3. 65m、寬0. 7 m、高1. 9 m 的液力傳動(dòng)變速箱檢測(cè)試驗(yàn)臺(tái)。適于安裝檢測(cè)Allison 或ZF 等各種大小、型號(hào)不同的液力傳動(dòng)變速箱。4. 2 控制系統(tǒng)及工作原理在液力傳動(dòng)變速箱檢測(cè)試驗(yàn)臺(tái)控制板操作臺(tái)上設(shè)置了六大控制系統(tǒng):電源控制系統(tǒng)、SVF (變頻調(diào)速) 控制系統(tǒng)、液壓控制系統(tǒng)、ZF 控制系統(tǒng)、Allison 控制系統(tǒng)、負(fù)載調(diào)節(jié)系統(tǒng),集電控、液控、氣控、機(jī)控為一體,檢測(cè)功能齊全、外形美觀、操作簡(jiǎn)便,試運(yùn)行安全可靠。 電源控制系統(tǒng):控制變頻調(diào)速器、電機(jī)、液壓、ZF、Allison 等各控制系統(tǒng)所需的電源。 SVF(變頻調(diào)速)控制系統(tǒng):主要由SVF - 400變頻調(diào)速器組成,控制55 kW、2950 r/ min的電機(jī)轉(zhuǎn)速,使電機(jī)在規(guī)定轉(zhuǎn)速范圍內(nèi)轉(zhuǎn)速可以任意調(diào)節(jié),實(shí)現(xiàn)變速箱不同擋位的變速。轉(zhuǎn)速表一目了然隨時(shí)反映了電機(jī)的不同轉(zhuǎn)速。 液壓控制系統(tǒng):是變速箱自動(dòng)加油、換油系統(tǒng),也可檢測(cè)離合器內(nèi)密封件是否泄露。由液壓泵、三位四通閥、4KW電動(dòng)機(jī)、油箱、液壓管線(xiàn)等組成。油壓板上的油壓表清晰地反映了擋位油壓和系統(tǒng)油壓。 ZF 控制系統(tǒng):主要為控制ZF變速箱擋位的轉(zhuǎn)換,設(shè)計(jì)了一套程序。 Allison 控制系統(tǒng): HT750DR 美國(guó)Allison 變速箱有七個(gè)擋位,即D5 、D4 、D3 、D2 、D1 、N、R。根據(jù)發(fā)電機(jī)負(fù)載功率的變化實(shí)現(xiàn)變速箱的變速。 負(fù)載控制系統(tǒng):主要檢測(cè)變速箱的輸出功率,由功率表、負(fù)載控制柜、發(fā)電機(jī)等組成。 氣路和油路控制:氣路主要控制變速箱換檔機(jī)構(gòu),油路控制變速箱的執(zhí)行機(jī)構(gòu),也就是摩擦片和制動(dòng)器的結(jié)合或分離。5 結(jié)束語(yǔ):Allison 變速箱大修過(guò)程中解決的主要問(wèn)題 井下三公司HT750DR 美國(guó)Allison 變速箱通過(guò)解體檢查發(fā)現(xiàn)存在以下問(wèn)題: (1)注油泵驅(qū)動(dòng)齒輪打掉,金屬末掉進(jìn)變速箱油底殼;1 - 5 檔離合器摩擦片磨損;閉鎖離合器摩擦片磨損。我們將無(wú)法修復(fù)的注油泵、止推軸承、過(guò)橋齒輪及軸承、驅(qū)動(dòng)齒輪及全部摩擦片、密封件、濾芯進(jìn)行更換,裝配各分總成再組裝成變速箱。放干凈變速箱油,包扎好外露油道,用固定架固定穩(wěn)妥。將變速箱總成安裝到檢測(cè)試驗(yàn)臺(tái)上,按測(cè)試規(guī)范進(jìn)行調(diào)試,達(dá)到了指標(biāo)要求。制動(dòng)器工作正常,無(wú)異響、無(wú)泄露,成功投入了修井使用。 (2) 井下二公司修井機(jī)HT750DR 美國(guó)Allison 變速箱溫度過(guò)高,壓力過(guò)低。在解體修理后安裝到修井機(jī)上時(shí),變矩器漏油漏到發(fā)動(dòng)機(jī)飛輪殼體,使發(fā)動(dòng)機(jī)飛輪殼油位升高,壓力升高,造成飛輪殼油封漏油。因?yàn)槁┯蛶状尾鹦稒z查才發(fā)現(xiàn)這臺(tái)變速箱的變矩器外殼裂了。重新焊接后上車(chē)床加工好,故障得以排除。 (3) 特修公司CLT754 美國(guó)Allison 變速箱解體檢查時(shí)發(fā)現(xiàn)問(wèn)題較多: 注油泵齒輪松曠內(nèi)軸承損壞;二檔活塞銷(xiāo)柱斷損1 只;中排行星齒輪松礦;轉(zhuǎn)速表軸頭磨損;閉鎖后板及(菱形) 鍵磨損;主軸(帶齒輪花鍵) 軸頭磨損;取力軸承、閉鎖摩擦片及各前進(jìn)檔鋼片、摩擦片、密封件損壞。我們更換中排行星架總成等總成件或配件91 件,加工修復(fù)了注油泵總成、主軸、飛輪總成、閉鎖后板、一檔活塞座等,排除故障,解決了存在的問(wèn)題。組裝調(diào)試完畢,送生產(chǎn)前線(xiàn)安裝到修井機(jī)上投入了修井使用。 (4) 井下二大隊(duì)CLT754美國(guó)Allison 變速箱速度低,溫度高,閉鎖離合器打滑,摩擦片和鋼片磨損。通過(guò)拆檢發(fā)現(xiàn)各檔摩擦片和鋼片、密封件、推力軸承損壞。我們更換了密封件大修包,各檔摩擦片和鋼片、止推軸承等68 件,組裝調(diào)試完畢,安裝到修井機(jī)上投入了修井使用。
收藏