土方工程的地基勘察與施工畢業(yè)論文外文翻譯1

上傳人:1888****888 文檔編號:38640265 上傳時間:2021-11-08 格式:DOC 頁數(shù):6 大小:41.52KB
收藏 版權(quán)申訴 舉報 下載
土方工程的地基勘察與施工畢業(yè)論文外文翻譯1_第1頁
第1頁 / 共6頁
土方工程的地基勘察與施工畢業(yè)論文外文翻譯1_第2頁
第2頁 / 共6頁
土方工程的地基勘察與施工畢業(yè)論文外文翻譯1_第3頁
第3頁 / 共6頁

下載文檔到電腦,查找使用更方便

15 積分

下載資源

還剩頁未讀,繼續(xù)閱讀

資源描述:

《土方工程的地基勘察與施工畢業(yè)論文外文翻譯1》由會員分享,可在線閱讀,更多相關(guān)《土方工程的地基勘察與施工畢業(yè)論文外文翻譯1(6頁珍藏版)》請在裝配圖網(wǎng)上搜索。

1、DESIGN AND EXECUTION OF GROUND INVESTIGATION FOR EARTHWORKS PAUL QUIGLEY, FGSIrish Geotechnical Services LtdABSTRACTThe design and execution of ground investigation works for earthwork projects has become increasingly important as the availability of suitable disposal areas becomes limited and costs

2、 of importing engineering fill increase. An outline of ground investigation methods which can augment traditional investigation methods particularly for glacial till / boulder clay soils is presented. The issue of geotechnical certification is raised and recommendations outlined on its merits for in

3、corporation with ground investigations and earthworks.1. INTRODUCTIONThe investigation and re-use evaluation of many Irish boulder clay soils presents difficulties for both the geotechnical engineer and the road design engineer. These glacial till or boulder clay soils are mainly of low plasticity a

4、nd have particle sizes ranging from clay to boulders. Most of our boulder clay soils contain varying proportions of sand, gravel, cobbles and boulders in a clay or silt matrix. The amount of fines governs their behaviour and the silt content makes it very weather susceptible.Moisture contents can be

5、 highly variable ranging from as low as 7% for the hard grey black Dublin boulder clay up to 20-25% for Midland, South-West and North-West light grey boulder clay deposits. The ability of boulder clay soils to take-in free water is well established and poor planning of earthworks often amplifies thi

6、s.The fine soil constituents are generally sensitive to small increases in moisture content which often lead to loss in strength and render the soils unsuitable for re-use as engineering fill. Many of our boulder clay soils (especially those with intermediate type silts and fine sand matrix) have be

7、en rejected at the selection stage, but good planning shows that they can in fact fulfil specification requirements in terms of compaction and strength.The selection process should aim to maximise the use of locally available soils and with careful evaluation it is possible to use or incorporate poo

8、r or marginal soils within fill areas and embankments. Fill material needs to be placed at a moisture content such that it is neither too wet to be stable and trafficable or too dry to be properly compacted.High moisture content / low strength boulder clay soils can be suitable for use as fill in lo

9、w height embankments (i.e. 2 to 2.5m) but not suitable for trafficking by earthwork plant without using a geotextile separator and granular fill capping layer. Hence, it is vital that the earthworks contractor fully understands the handling properties of the soils, as for many projects this is effec

10、tively governed by the trafficability of earthmoving equipment.2. TRADITIONAL GROUND INVESTIGATION METHODS For road projects, a principal aim of the ground investigation is to classify the suitability of the soils in accordance with Table 6.1 from Series 600 of the NRA Specification for Road Works (

11、SRW), March 2000. The majority of current ground investigations for road works includes a combination of the following to give the required geotechnical data: Trial pits Cable percussion boreholes Dynamic probing Rotary core drilling In-situ testing (SPT, variable head permeability tests, geophysica

12、l etc.) Laboratory testingThe importance of phasing the fieldwork operations cannot be overstressed, particularly when assessing soil suitability from deep cut areas. Cable percussion boreholes are normally sunk to a desired depth or refusal with disturbed and undisturbed samples recovered at 1.00m

13、intervals or change of strata.In many instances, cable percussion boring is unable to penetrate through very stiff, hard boulder clay soils due to cobble, boulder obstructions. Sample disturbance in boreholes should be prevented and loss of fines is common, invariably this leads to inaccurate classi

14、fication.Trial pits are considered more appropriate for recovering appropriate size samples and for observing the proportion of clasts to matrix and sizes of cobbles, boulders. Detailed and accurate field descriptions are therefore vital for cut areas and trial pits provide an opportunity to examine

15、 the soils on a larger scale than boreholes. Trial pits also provide an insight on trench stability and to observe water ingress and its effects.A suitably experienced geotechnical engineer or engineering geologist should supervise the trial pitting works and recovery of samples. The characteristics

16、 of the soils during trial pit excavation should be closely observed as this provides information on soil sensitivity, especially if water from granular zones migrates into the fine matrix material. Very often, the condition of soil on the sides of an excavation provides a more accurate assessment o

17、f its in-situ condition.3. SOIL CLASSIFICATIONSoil description and classification should be undertaken in accordance with BS 5930 (1999) and tested in accordance with BS 1377 (1990). The engineering description of a soil is based on its particle size grading, supplemented by plasticity for fine soil

18、s. For many of our glacial till, boulder clay soils (i.e. mixed soils) difficulties arise with descriptions and assessing engineering performance tests.As outlined previously, Irish boulder clays usually comprise highly variable proportions of sands, gravels and cobbles in a silt or clay matrix. Low

19、 plasticity soils with fines contents of around 10 to 15% often present the most difficulties. BS 5930 (1999) now recognises these difficulties in describing mixed soils the fine soil constituents which govern the engineering behaviour now takes priority over particle size.A key parameter (which is

20、often underestimated) in classifying and understanding these soils is permeability (K). Inspection of the particle size gradings will indicate magnitude of permeability. Where possible, triaxial cell tests should be carried out on either undisturbed samples (U100s) or good quality core samples to ev

21、aluate the drainage characteristics of the soils accurately.Low plasticity boulder clay soils of intermediate permeability (i.e. K of the order of 10-5 to 10-7 m/s) can often be conditioned by drainage measures. This usually entails the installation of perimeter drains and sumps at cut areas or borr

22、ow pits so as to reduce the moisture content. Hence, with small reduction in moisture content, difficult glacial till soils can become suitable as engineering fill.土方工程的地基勘察與施工保羅圭格利愛爾蘭巖土工程服務(wù)有限公司摘 要:當工程場地的處理面積有限且填方工程費用大量增加時,土方工程的地基勘察設(shè)計與施工已逐漸地變得重要。由于冰漬土以及含礫粘土的提出使土方工程地基勘察方法的綱要比傳統(tǒng)的勘察方法更詳細。 本文提出“巖土認證”觀點以

23、及對地基勘察與土方工程相結(jié)合的優(yōu)點加以概要說明。1、引 言許多愛爾蘭含礫粘土的勘察與再利用評價使巖土工程師與道路工程師感到為難。這些冰漬土或含礫粘土主要表現(xiàn)為低可塑性而且還含有從粘土到漂石的不同粒徑顆粒。大部分本地粘土與淤泥質(zhì)土中包含不同比例的砂、礫石、卵石、漂石。顆粒級配控制著土體的行為,而且淤泥使土體性質(zhì)易受天氣變化影響。土體含水量隨著地區(qū)不同而不同,從都柏林硬灰黑含礫粘土的7%到中部、西南部或西北部淺灰色含礫粘土沉積物的20%-25%。含礫粘土吸附水的能力建立的較好但土方工程中計劃的不恰當常導致其擴大。一般來說,良好級配的土體對于含水量的輕微變大相當敏感,將導致強度下降或不適合用作工程回

24、填土。許多含礫粘土(尤其中等淤泥質(zhì)土或良好級配的砂)在選擇階段已經(jīng)被篩除,但事實上它們能對壓縮或強度起到特定的作用。篩選過程應(yīng)盡量使用本地土體或者回填區(qū)或路堤邊性質(zhì)相對較差的土體,通過仔細評價應(yīng)加以應(yīng)用?;靥畈牧媳仨毐3忠欢ǖ暮?,既不能太濕導致土體不穩(wěn)定也不能太干以致不能被充分壓縮。高含水量、低強度含礫粘土適用于低路堤回填(相當于2到2.5米的高度)但不適用于沒有使用土工織布隔離與回填層的土方回填工程。因此,土方工程承包商充分認識土體的處理特性相當重要,因為許多工程都受到挖掘設(shè)備通行能力的影響。2、傳統(tǒng)地基勘察方法對于道路工程來講,地基勘察最基本目標是對土體適用性進行類似表6.1的分類,該

25、表源于國家檔案登記處2000年3月版的道路施工規(guī)范。目前大部分道路施工中的地基勘察包含以下提供有關(guān)巖土參數(shù)的試驗方法: 取樣孔 靜壓法取樣 動力探測 回轉(zhuǎn)鉆進 原位測試(標準貫入試驗,變水頭滲透試驗,巖土物理試驗等) 室內(nèi)試驗評價場地工作的重要性特別是評價土體深部取樣區(qū)域的適用性時不能過分強調(diào)其適用性。靜壓法取樣通常將取樣器下沉至要求深度進行取樣,并每間隔一米進行取樣。在許多情況下,靜壓法取樣由于卵石、漂石阻礙不能壓入非常堅硬的含礫粘土。土樣在鉆孔內(nèi)應(yīng)盡量少擾動,但級配變壞是很正常的,級配變壞將導致土樣分類不夠精確。取樣孔對于恢復適當尺寸的土樣以及觀察碎屑巖在卵石、漂石中所占比例來說應(yīng)該是適當

26、的。因此,詳盡且精確的地區(qū)描述取樣區(qū)域以及取樣空來說都相當重要,而且還為它們提供了檢查土體在鉆孔范圍以外性質(zhì)的良機。取樣孔也提供了孔壁穩(wěn)定性的評價以及觀察孔壁內(nèi)水進入時所造成的影響。一位有經(jīng)驗的巖土工程師或工程地質(zhì)專家應(yīng)監(jiān)督取樣孔工作以及土樣的恢復。因為土樣性質(zhì)為土樣敏感性提供了信息,所以取樣時土體性質(zhì)應(yīng)被密切關(guān)注,尤其是水從小顆粒區(qū)域遷移到良好級配區(qū)域。而且土體在開挖時的條件為其原位條件提供了一個相對精確的評價。3、土的分類土的描述與分類應(yīng)該依照英國標準5930(1999)進行并依照英國標準1337(1990)進行測試。土的工程描述應(yīng)基于按粒徑大小分級并依照良好級配土的可塑性進行補充。對于許

27、多冰漬土或含礫粘土(混合土)的難點在于其描述與工程性質(zhì)測試的評價。關(guān)于以前的地基勘察綱要,愛爾蘭含礫粘土的粘土與淤泥質(zhì)土中常由易變比例的砂、礫石、卵石組成。良好級配且含水量為10%-15%的低可塑性土最難進行描述與分類?,F(xiàn)在英國標準5930(1999)已認識到描述“混合土”所存在的難點土的良好級配較之顆粒尺寸對于控制著土的工程性質(zhì)更優(yōu)越。一個關(guān)鍵參數(shù)在土分類以及理解過程中經(jīng)常被低估,該參數(shù)就是滲透系數(shù)K。檢查土的顆粒級配將間接說明土的滲透系數(shù)的大小。假如可能,為了準確評價土體的排水特性,三軸單元試驗將采用無擾動原狀土樣或高質(zhì)量土樣進行試驗。低可塑性的中等滲透性含礫粘土(K大約在10-5到10-7米.秒范圍內(nèi))能經(jīng)常通過不同排水條件進行“模擬”。其必須在取樣區(qū)域安裝排水邊界以及水坑邊界或借用鉆孔以減少土樣的含水量。因此,由于含水量的小量減少,工程性質(zhì)復雜的冰漬土也能當作合適的工程填土加以應(yīng)用。6

展開閱讀全文
溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

相關(guān)資源

更多
正為您匹配相似的精品文檔
關(guān)于我們 - 網(wǎng)站聲明 - 網(wǎng)站地圖 - 資源地圖 - 友情鏈接 - 網(wǎng)站客服 - 聯(lián)系我們

copyright@ 2023-2025  zhuangpeitu.com 裝配圖網(wǎng)版權(quán)所有   聯(lián)系電話:18123376007

備案號:ICP2024067431-1 川公網(wǎng)安備51140202000466號


本站為文檔C2C交易模式,即用戶上傳的文檔直接被用戶下載,本站只是中間服務(wù)平臺,本站所有文檔下載所得的收益歸上傳人(含作者)所有。裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對上載內(nèi)容本身不做任何修改或編輯。若文檔所含內(nèi)容侵犯了您的版權(quán)或隱私,請立即通知裝配圖網(wǎng),我們立即給予刪除!