HAREVESS-COVER注塑模設(shè)計【支架】【說明書+CAD+PROE】
HAREVESS-COVER注塑模設(shè)計【支架】【說明書+CAD+PROE】,支架,說明書+CAD+PROE,HAREVESS-COVER注塑模設(shè)計【支架】【說明書+CAD+PROE】,harevess,cover,注塑,設(shè)計,說明書,仿單,cad,proe
重要提示:各類電子文檔標準格式中的說明(用藍色或紅色字體表示),在參閱后請自行刪除(包括本提示),黑色字體的內(nèi)容全部保留! 河南機電高等??茖W(xué)校畢業(yè)設(shè)計(論文)任務(wù)書系 部: 材料工程系 專 業(yè): 模具制造與設(shè)計 學(xué)生姓名: 謝瑞麗 學(xué) 號: 0312421 設(shè)計(論文)題目: HAREVESS-COVER注塑模 起 迄 日 期: 2006 年 5月1 日 5 月15 日 指 導(dǎo) 教 師: 于智宏 發(fā)任務(wù)書日期: 2006 年 2 月 25 日任務(wù)書填寫要求1畢業(yè)設(shè)計(論文)任務(wù)書由指導(dǎo)教師根據(jù)各課題的具體情況填寫,經(jīng)學(xué)生所在專業(yè)的負責(zé)人審查、系主管領(lǐng)導(dǎo)簽字后生效。此任務(wù)書應(yīng)在畢業(yè)設(shè)計(論文)開始前一周內(nèi)填好并發(fā)給學(xué)生;2任務(wù)書內(nèi)容必須用黑墨水筆工整書寫或按教務(wù)處統(tǒng)一設(shè)計的電子文檔標準格式(可從教務(wù)處網(wǎng)頁上下載)打印,不得隨便涂改或潦草書寫,禁止打印在其它紙上后剪貼;3任務(wù)書內(nèi)填寫的內(nèi)容,必須和學(xué)生畢業(yè)設(shè)計(論文)完成的情況相一致,若有變更,應(yīng)當經(jīng)過所在專業(yè)及系主管領(lǐng)導(dǎo)審批后方可重新填寫;4任務(wù)書內(nèi)有關(guān)“系”、“專業(yè)”等名稱的填寫,應(yīng)寫中文全稱,不能寫數(shù)字代碼,學(xué)生的“學(xué)號”要寫全號,請規(guī)范化填寫;5任務(wù)書內(nèi)“主要參考文獻”的填寫,應(yīng)按照國標GB 771487文后參考文獻著錄規(guī)則的要求書寫,不能有隨意性;6有關(guān)年月日等日期的填寫,應(yīng)當按照國標GB/T 740894數(shù)據(jù)元和交換格式、信息交換、日期和時間表示法規(guī)定的要求,一律用阿拉伯數(shù)字書寫。如“2002年4月2日”或“2002-04-02”。畢 業(yè) 設(shè) 計(論 文)任 務(wù) 書1本畢業(yè)設(shè)計(論文)課題來源及應(yīng)達到的目的: 課題來源于老師發(fā)放的任務(wù)書,題目是HAREVESS-COVER注塑模。本設(shè)計題目為普通零件連接件,但對做畢業(yè)設(shè)計的畢業(yè)生有一定的設(shè)計意義,它概括了形形塑料零件的設(shè)計要求、內(nèi)容及方向。通過對該零件模具的設(shè)計,進一步加強了我的注塑模設(shè)計的基礎(chǔ),為設(shè)計更復(fù)雜的注塑模具做好了鋪墊和吸取了更深刻的經(jīng)驗。2本畢業(yè)設(shè)計(論文)課題任務(wù)的內(nèi)容和要求(包括原始數(shù)據(jù)、技術(shù)要求、工作要求等): 該塑件是一個連接型內(nèi)外有倒勾的外觀型零件,其零件圖如下圖所示,本塑件的材料采用PC+ABS生產(chǎn)類型為大批量生產(chǎn)。 從零件圖上分析,該零件總體形狀為環(huán)形。在塑件內(nèi)部有三個倒勾,寬度為72mm,塑件總高度為52mm,長度尺寸29.06mm。因此模具設(shè)計時采用斜銷和斜滑塊抽芯機構(gòu)使制品脫模容易,模具結(jié)構(gòu)簡單。這可遮掩成型過程中在塑件表面上形成的疵點,絲痕,波紋等缺陷,其目的是為了增大么擦力,便于工作時施力。所在專業(yè)審查意見:負責(zé)人: 年 月 日系部意見:系領(lǐng)導(dǎo): 年 月 日河南機電高等專科學(xué)校畢業(yè)設(shè)計(論文)評語學(xué)生姓名: 謝瑞麗 班級: 模具034 學(xué)號: 0312421 題 目: HAREVESS-COVER注塑模 綜合成績: 指導(dǎo)者評語: 指導(dǎo)者(簽字): 年 月 日畢業(yè)設(shè)計(論文)評語評閱者評語: 評閱者(簽字): 年 月 日答辯委員會(小組)評語: 答辯委員會(小組)負責(zé)人(簽字): 年 月 日河南機電高等??茖W(xué)校畢業(yè)設(shè)計/論文 (連接卡注塑模) 摘要我所學(xué)習(xí)的專業(yè)是模具設(shè)計與制造專業(yè),這次的畢業(yè)設(shè)計是瓶蓋塑料模具設(shè)計。該設(shè)計結(jié)合大學(xué)三年來所學(xué)習(xí)的專業(yè)知識和CAD軟件所設(shè)計出的一套塑料模。本文首先簡要的概述了塑料模在社會領(lǐng)域中的作用及其以后的發(fā)展方向,點明模具設(shè)計的重要意義。然后依據(jù)工件圖進行工藝性分析,進而確定了設(shè)計方案,計算出模具工作部分的尺寸,設(shè)計出工作零部件;然后依據(jù)設(shè)計要求選擇出各個標準零部件,然后設(shè)計出模具的總裝配圖。在設(shè)計中,最重要的就是設(shè)計方案的確定、坯料的計算和工作零部件的設(shè)計,這是設(shè)計的關(guān)鍵,這些設(shè)計的正確與否直接關(guān)系到成本的高低和設(shè)計模具能否正常工作;在設(shè)計的最后,總結(jié)了自己的心得和體會,并對我的指導(dǎo)老師表示感謝。為了我的設(shè)計更加簡明易懂,在設(shè)計中,我用了CAD軟件畫了十幾張零件圖,安插在設(shè)計任務(wù)書中。最后畫出一瓶蓋塑料模裝配圖和主要工作零部件零件圖若干張。通過次畢業(yè)設(shè)計使我不僅掌握了塑料模具設(shè)計的一般流程,更學(xué)習(xí)到了好多課本上沒有學(xué)習(xí)到的知識,使我受益非淺。關(guān)鍵詞:模具設(shè)計與制造、CAD軟件、工藝性分析。 (HAREVESS-COVER注塑模) Abstractknowledge of study and a set of plastic moulds that CAD software designed over the past three years of university. This text the brief plastic role in social field of mould of summary and developing direction afterwards at first, point out in the important meaning of mold design. Then carry on the craft to analyse according to the work piece picture , and then has confirmed the design plan , calculate out mould work some size , design the job spare part; Then choose each standard spare part according to the designing requirement , then design the total installation diagram of the mould . In the design, the important one is sureness , calculation of the blank and design of the job spare part of the design plan the most, this is the key to designing, whether these ones that are designed involve directly or not correctly whether the level of the cost and design mould could work normally; At the end that is designed , have summarized ones own gains and experience , and express thanks for my counselor. More concisly and easy for my design understands , in the design, I have drawn a dozen parts picture in CAD software, assign into design specifications . Draw one end finally and overlay the plastic mould installation diagram and several pieces of spare part part Fig. of groundwork. Make me not merely grasp the general procedure of pl astic mold designthrough graduation project once, study to the knowledge not learning to get on many textbooks even more, benefit me a great deal. Keyword: Mold design and making , CAD software , craft analysis.3 A Branch and Bound Algorithm Based Process-Planning System for Plastic Injection Mould Bases ( Int J Adv Manuf Technol (2001) 18:624-6322001 Springer-Verlag London Limited) P. Y. Gan, K. S. Lee and Y. F. Zhang ( Department of Mechanical Engineering, National University of Singapore, Singapore) This paper describes the use of artificial intelligence in the process planning of plastic injection mould bases. The computer-aided process-planning system, developed for IMOLD will extract and identify the operations required for machining.These operations are considered together with their precedence constraints and the available machines before the process plan for the mould base plate is generated. The process plan is optimised by a branch and bound based algorithm. Overallmachining time has been proposed as the objective function for optimisation. The ability of this algorithm to search intelligently for a feasible optimised solution is illustrated by an industrial case study. A brief comparison with a genetic algorithm based process planning system is also made. The result of this development will allow users to optimise process plans easily for any given mould base, with options to suit dynamic changes on the manufacturing shop floor. Keywords: Branch and bound algorithm; Computer-aided process-planning (CAPP); Optimisation; Plastic injection mould base 1. Introduction Computer-aided process planning (CAPP) has received much attention in recent years. It has long been identified as the bridge between computer-aided design (CAD) and computeraided manufacturing (CAM) systems to achieve a fully automated factory. Despite the need, insufficient CAPP systems have been developed for the different industries requiring them. This work focuses on developing a CAPP system for mould base makers. At present, most process planning for the production of mould bases is done manually. The process plans depend very much on the decisions of the process planner. The introduction of CAPP systems should ensure consistently good process plans with more comprehensive consideration ofthe manufacturing parameters. CAPP systems are required in industry for the following reasons: 1. Mould base companies are receiving an increasing number of requests to manufacture customised mould bases, in which additional features are added to a standard mould base. Therefore, extra operations are required to create these new features. Usually, standard mould bases have a predetermined process plan, which is optimised for the amount of machining required. As new operations are added, this optimised process plan is disrupted and manual process planning is unable to keep up with the changes. CAPP systems are able to re-optimise the process plan constantly to ensure optimality of the process plans used. 2. Overall shop floor conditions should be taken into accountduring process planning. Manual process planning is unableto consider all shop floor changes and apply them efficiently. Only CAPP systems allow rigorous consideration of optimisation. The goal of this work is to develop a CAPP system for process planning mould bases. PDF 文件使用 pdfFactory Pro 試用版本創(chuàng)建 IMOLD (Intelligent Mold Design) is a knowledge-based application software developed at the Department of Mechanical Engineering, NUS to facilitate plastic injection mould design. The system is an addition to IMOLD , and it process plans the mould bases created using IMOLD . Databases of machines, tools, precedence constraints, and the model part file are read together with real-time inputs of machine availability during process planning. An operator is required to enter the customised features and a process plan is then generated using some form of artificial intelligence. The branch and bound technique is the chosen search algorithm here. This paper presents the operation of a flexible CAPP system aimed at assisting process planners in more comprehensive considerations during operations planning. A brief literature survey is provided of some forms of artificial intelligence used in process planning and related work in this field. Problem formulation and the branch and bound algorithm implemented are included in the following sections. Lastly, a case study demonstrates the usability and potential of this system. A comparison between branch and bound based CAPP and genetic algorithm based CAPP is shown in a second case study. 2. Background Process planning is the preparation of a set of detailed instructions for all the steps required to create the final product from a piece of raw material 1. The quality of a process plan depends very much on the skills of the process planner, as extensive knowledge of the available tools, the machines and the operations needed to create a part is required 2. A CAPP system is therefore seen as an important tool for assisting in process planning. A CAPP system should optimise a part for all possible methods of manufacturing. However, many reported CAPP systems are not able to generate globally optimised process plans 3. As a result, there has been an increasing use of artificial intelligence to search for global solutions 4,5. Many of the reported methods involve only feature sequencing without including details of the operations required 6,7. Details of the operations are necessary for allocating shop floor resources for performing the operations. The performance measure is the objective function to be maximised or minimised in all optimisation problems. For process planning, the objective is either to minimise time, cost, or sometimes both. There is a variety of work done using cost as the performance measure 8. However, there is also a range of cost models that can be used to consider and calculate cost 9,10, but there is no universal method to account for costs. It is known that to minimise work-in-progress and the flowtime of jobs in a job shop, process plans with the least overall machining time should be used 11. We therefore use time, as it is a more definite basis on which to quantify the quality of generated process plans. This choice is further justified, as the delivery time of mould bases is very important in mouldmaking industries. An exhaustive sequential search for a process plan solution leads to unacceptable computation times when a large number of operations are required. This work uses a branch and bound algorithm to search intelligently for the optimal or near optimal process plan. The branch and bound algorithm is a well-known search algorithm for implicit enumeration of the search space 12. Its use as an artificial intelligence method has been reported widely in the areas of scheduling, process planning, and problem solving 13. Some work has been reported using the branch and bound technique for process PDF 文件使用 pdfFactory Pro 試用版本創(chuàng)建 planning 14 16. However, the nature of process plans in those works is different from the process planning required for the mould making industry. This work uses the branch and bound technique to process plan all the operations considering all tool access directions on all the available machines and tools for each mould base plate. To the best of our knowledge, such a level of consideration has not been dealt with in other related studies. 3. Problem Formulation A process-planning problem is constrained to the number of operations, precedence relations, machines, machining direction, and tools. The optimised solution is a way to sequence the operations with their associated machines to produce a process plan, which takes the least possible production time. 3.1 Process Planning Model The information required for optimisation is extracted from mould bases modelled using IMOLD剖 . This database of operations, machines, machining direction, tools, and precedence constraints is used for process planning together with machine availability. A schematic representation of this model is shown in Fig. 1 and the following assumptions are made: 1. Only one operation can be processed by one machine at a time. 2. All the machines can access the part at only one particular face. If machining is to be done on another face, the part has to be taken down and set-up time has to be incurred to replace the part facing a different direction. 3. Cranes or robots are available at all times. No waiting time is allowed for time wasted while waiting for machinery or labour to move the parts. Customised features require the process planner to input the necessary data manually. This is because a single feature can be created by many possible methods and this allows the process planner more control over the system. The assigned operations and the final generated process plan should satisfy the following conditions: 1. The features of the mould base plate are recognised with the operations assigned to them. The operations assigned should produce the desired shape, dimension, tolerance, and finish to the feature. PDF 文件使用 pdfFactory Pro 試用版本創(chuàng)建 2. The sequence of operations obtained from the process plan should not violate any precedence relations governing the operations. 3. Operations can only be carried out on available machines with the available tools, which are capable of machining that particular feature. The process plan obtained should include the number of operations to be carried out, the sequence of these operations, the machines, machining direction, and corresponding tools used. Such details are necessary so that time can be saved for operations to be carried out on a particular machine using the same set-up. For example, a blind hole must be drilled in the x direction whereas a through hole can be drilled from the x or x directions. It can be seen by considering just thesetwo operations, that the process plan should try to perform these two operations on the same machine from the x direction so that extra set-up time is not incurred. 3.2 The Objective Function To quantify the objective function, which is the overall machining time (OMT), we use a calculation framework similar to that used by Zhang et al. 17. The objective function is calculated for each successive sequence of the process plans and the sequence that yields the minimum OMT will be taken as the final process plan. There are 3 areas which contribute to the calculation of OMT, and they are machine set-up times, machining direction set-up times, and machining times. 3.2.1 Machine Set-up Time Machine set-up time (MST) is considered whenever there is a change of machines between two operations. It is defined as the time required to move between machines and PDF 文件使用 pdfFactory Pro 試用版本創(chuàng)建 the set-up time of the mould baseplate onto the machine in a particular direction. It is defined for a total of all n operations as Mi refers to the machine selected to process operation i,MSTIi refers to the machine set-up time index for the machine used in operation i, and n is the number of operations selected for the whole series of operations identified from the mould features. 3.2.2 Machining Direction Set-up Time Machining direction set-up time (MDST) is the time required to change the orientation of the mould baseplate on the same machine. MDST is calculated only when there is a change in machining direction, but no change of machine between the two operations. It is defined as, MDi is the machining direction selected to process operation i and MDSTIi is the machining direction set-up time index for the machine used in operation i. MDSTIi and MSTIi are related by the difference in time to move the part between the old and new machine. MSTIi = MDSTIi (4) + (Time to move part between machines) As no waiting time for the cranes or robots is assumed, we take MDSTIi and MSTIi to be the same. 4.Conclusions This paper illustrates a branch and bound based CAPP system It considers operation sequencing, machines, machining direc-tions, and tools, and is able to provide a detailed process plan. It can be customised easily to account for tool change time and to accommodate different environments. The system offers a comprehensive shop floor consideration in its optimisation of overall machining time. PDF 文件使用 pdfFactory Pro 試用版本創(chuàng)建 The case study has achieved good process plans that are capable of readjusting operation sequences to accommodate any shop floor changes. The computation times required to achieve the solution for actual mould baseplates are found to be reasonable for process planning purposes. Comparison with the GA based system has proved that the branch and bound based system is able to match the GA based system for most problems, and obtains good solutions faster. The module offers an approach to suit dynamic changes and is more adaptable than approaches which assume a fixed shop floor environment. Development of the CAPP system will allow quantitative comparisons to be made between different generated process plans and help to evaluate manufacturing processes better. In the future, other performance measures such as costs and also the use of this module for more complex parts will be explored. References 1. C. B. Besant and C. W. K. Lui, Computer-Aided Design and Manufacture, 3rd edn, Ellis Horwood, 1986. 2.T. C. Chang, Expert Process Planning for Manufacturing, Addison- Wesley, 1990. 3. M. C. Kayacan, I. H. Filiz, A. I. So nmez, A. Baykasoglu and T. Dereli. “ OPPS-ROT: an optimised process planning system for rotational parts” , Computers in Industry, 32, pp. 181 95, 1996. 4. D. T. Pham and P. T. N. Pham, “ Artificial intelligence in engineering” ,International Journal of Machine Tools and Manufacture, 39, pp. 937 949, 1999. PDF 文件使用 pdfFactory Pro 試用版本創(chuàng)建 5. C. Leung Horris, “ Annotated bibliography on computer-aided process planning” , International Journal of Manufacturing Technology” ,12, pp. 309 329, 1996. 6. Jo zsef Va ncza and Andra s Ma rkus, “ Experiments with the integration of reasoning, optimisation and generalisation in process planning” , Advances in Engineering Software, 25, pp. 29 39, 1996. 7. Philip Husbands, Frank Mill and Stephen Warrington, “ Generating optimal process plans from first principles” , in Expert Systems for Management and Engineering, Chapter 8. Balagurusamy and Howe (Ed), Ellis Horwood Publishers, 1990. 8. D. Kiritsis, K.-P. Neuendorf and P. Xirouchakis. “ Petri net techniques for process planning cost estimation” , Advances in Engineering Software, 30(6), pp. 375 387, June 1999. 9. C. Ou-Yang and T. S. Lin, Developing an integrated framework for feature-based early manufacturing cost estimation. International Journal of Advanced Manufacturing Technology, 13(9) pp. 618 629, 1997. 10. A. Liebers and H. J. J. Kals, Cost decision support in product design, CIRP Annals, 46(1), pp. 107 112, 1997. 11. K. R. Baker, Introduction to Sequencing and Scheduling, Wiley, New York, 1974. 12. J. Blazewicz, K. H. Ecker, G. Schmidt and J. Weglarz, Scheduling in Computer and Manufacturing Systems, 2nd rev. edn, Springer-Verlag, PDF 文件使用 pdfFactory Pro 試用版本創(chuàng)建 1994. 13. J. L. Laurilere, “ Problem solving and artificial intelligence” , Prentice Hall, New York, 1990. 14. Y. M. Kyoung, K. K. Cho and C. S. Jun, “ Optimal tool selection for pocket machining in process planning” , Computers and Industrial Engineering, 33(3 4), pp. 505 508, December 1997. 15. J. Duflou, J. -P. Kruth and D. Van Oudheusden, “ Algorithms for the design verification and automatic process planning for bent sheet metal parts” , CIRP Annals, 48(1), pp. 405 408, 1999. 16. J. R. Duflou, D. Van Oudheusden, J.-P. Kruth and D. Cattrysse, “ Methods for the sequencing of sheet metal bending operations” ,International Journal of Production Research, 37(14), pp. 3185 3202, 1999. 17. F. Zhang, Y. F. Zhang and A. Y. C. Nee, “ Using geneticalgorithms in process planning for job shop machining” , IEEETransactions on Evolutionary Computation, 1(4), pp. 278 289,November 1997. 18. C. Y. Hung, K. S. Lee, M. Rahman and Y. F. Zhang, “ Mold base process planning by genetic algorithm” 1st International Conference on Die and Mold Technology, pp. 233 243 Beijing, P.R. China, 26 28 July 2000. PDF 文件使用 pdfFactory Pro 試用版本創(chuàng)建
收藏