220kV地區(qū)變電所電氣一次系統(tǒng)設(shè)計(jì)03
220kV地區(qū)變電所電氣一次系統(tǒng)設(shè)計(jì)03,kv,地區(qū),變電所,電氣,一次,系統(tǒng),設(shè)計(jì),03
Examination of Smart Grids in Island Operation I Vokony PhD student A Dan Dr Senior Member IEEE Abstract This paper is qualified for the assessment of cooperation and interaction of smart grids that means a micro network with about zero transfer power and power system Primarily it examines the effect of the continuously increasing integration of the intelligent energy distribution networks concerning the stability of the power system In the paper the model is published used for simulating the smart grids and how to apply them for island operation assessment With the help of a model network the results of the simulations are presented and also the conclusions can be drawn are evaluated Index Terms Smart grid island operation frequency voltage dependent loads electro mechanical transients I INTRODUCTION he main phases of the electric network development were similar periods everywhere the early local supply was followed by short distance transfers and nowadays strongly meshed national or international networks are in operation The UCTE coordinates the operation and development of the electricity transmission grid of 24 European countries provides a reliable market platform to all participants of the Internal Electricity Market IEM and beyond The peak load of the UCTE in 2007 was about 390 GW and the electric energy consumption 2500 TWh This system supplies power for about 450 million people Fig 1 The topology of the UCTE This global energy network has many advantages however its disadvantages increasingly come to the light because of the expectations of the current market conditions As a consequence of extreme utilization the safety of supply may be dragged into danger which fact is reinforced by some events of the near past There is a need to develop small and simple system structures with easier control and design The micro grid may be a solution for these questions It simplifies the network in respect of control it is able to serve its own consumers and occasionally it can connect to the large network Analyzing of the steady state operation and transient behavior of this network is essential to set up an appropriate model II MODEL DESCRIPTION For set up and examination purposes a network analyzer software package developed by the Department of Electric Power Engineering TU Budapest was used With the help of the program can be analyzed steady states of networks load flow calculations effects of several faults and breaker operations during transients In addition to the steady state analysis dynamic simulations were also calculated The program is able to manage two synchronously operating systems with different frequency A control simulation was calculated by Power World Power Systems Analysis Software for the steady state simulations The model topology is shown in Fig 2 which was made by the Power World SAS The network model consists of high and middle voltage lines and buses 400 120 20 and 10 kV Transformers lines parallel lines generators and loads were involved Fig 2 The topology of the model network T Paper accepted for presentation at 2009 IEEE Bucharest Power Tech Conference June 28th July 2nd Bucharest Romania 978 1 4244 2235 7 09 25 00 2009 IEEE 1 Authorized licensed use limited to NORTH CHINA ELECTRIC POWER UNIVERSITY Downloaded on June 03 2010 at 02 04 41 UTC from IEEE Xplore Restrictions apply The sources can have power and or voltage control In the model there are two wind power parks connected to MO1S and MSZ20 buses three 5 MW gas turbines connected to the MO1G bus and a large machine connected to the G4 bus as a system slack bus in case of parallel operation with large network During island operation the gas turbines constitute the system slack In the two wind parks operate 25 x 2 MW wind turbines The loads are frequency and voltage dependent III SIMULATIONS A Examination of the short circuit power and voltage level The first examination is the effect of wind power sources on the three phase short circuit in the following 3 sc power of the MO1 120 kV bus In island operation the wind park is part of the smart grid The simulation result shows how influenced of the 3 sc power of the MO1 bus by an electrically far big power plant and an electrically near small wind power plant Interesting results can be expected if in the network the wind does not blow i e the power from the wind power plants is zero In this case the missing capacity has to be given by the G4 system slack bus and the sc capacity changes accordingly The model was used for voltage stability examinations To verify this fact the voltage conditions of the network have to be compared when the grid is in island operation and when the grid is connected to the network B Island operation examinations The island operation was established with a switch on MT1A VN1A and MT1B VN1B lines and so the two system frequencies were developed The following examination consisted of several steps the network operates as an island i e the MO1 bus and geographically close loads and sources form an island yellow area in Fig 3 The feasibility of island operation was examined Different operation situations and faults were simulated and the scale of voltage change was examined Fig 3 Topology of the island 1 Power changes The power generation of the wind power plant connected to the MO1S bus was reduced or increased by 0 5 MW steps until the frequency deviation as compared to the other system and compared to the 50 Hz as well exceeded 2 0 Hz A greater deviation would have such effect on the load that may cause failures This way however operating within the range of the limit e g in case of an interconnected system collapse the grid can become detached and stay operable by itself 2 Load changes Similar examinations were performed in relation to the 10 and 20 kV load connected to the MO1 bus In this case not the power but the consumption changed The robustness of the grid was observed how large consumption changes will not result 2 Hz frequency limit override 3 Shunt faults In the third trial group the grid was subject to extreme utilization Firstly one phase to ground short circuit in the following 1 G sc and then 3 sc was simulated on connection bus of 120 kV wind power plant and 3 sc on the 20 kV wind power plant From these simulation examinations a conclusion was wanted to be drawn down regarding the island operation conditions of a smart grid The conclusion should include the survey both of stability and voltage conditions C Reclosing the grid to the large network During these simulations it was examined how it is possible to switch back the in island operating grid to the large network and how the frequency of steady state level could be find First the grid was reclosed in normal stead state power balance and after it different situations were simulated The power was reduced and increased in 2 MW steps which is 2 Authorized licensed use limited to NORTH CHINA ELECTRIC POWER UNIVERSITY Downloaded on June 03 2010 at 02 04 41 UTC from IEEE Xplore Restrictions apply the size of one wind turbine in the grid so the frequency changed and after it back switch was attempted IV SIMULATION RESULTS AND EVALUATION Here will be reported the simulation results in the same order like in chapter III A Examination of the short circuit power and voltage level The 3 sc power was examined to find out how the network is influenced by the wind power plant park Diagram 1 and 2 show two important things first of all it can been seen that the gas turbine connected to the MO1G bus suffers larger oscillation in case of no wind power This means that it can operate more stable with the wind power plant park than without The simulation process was the following the system operates at steady state At t 1 sec 3 short circuit was simulated on the given bus The clearing time is 0 2 sec Diagram 1 Diagram 2 On the other hand the oscillations of the wind generators connected to the MSZ20 bus are smaller in amplitude and in periodic time when there is no power input from the MO1S wind power plant This is interesting that the MSZ20 s wind turbines supply own consumers in this area while power is provided from the MO1S wind power plant park If it is out of operation the interconnected system supplies the whole network so the MSZ20 bus s generators have smaller tension Diagram 3 and 4 Diagram 3 Diagram 4 It is possible to hold the voltage level in the grid in island operation as well Those nodes which are not voltage holder points have lower voltage level in the island than in the cooperation operation Diagram 5 And the remaining part of the network has a bit larger voltage level when the grid is in the island So the island operation does not mean a voltage level problem Diagram 5 The dark color nodes are together in the grid 3 Authorized licensed use limited to NORTH CHINA ELECTRIC POWER UNIVERSITY Downloaded on June 03 2010 at 02 04 41 UTC from IEEE Xplore Restrictions apply B Island operation examinations The main goal of this examination was to find out how flexible the system is Load was changed until the frequency change remains between 2 Hz Most of the consumers can tolerate this change of frequency but larger frequency deviation may cause system failures Diagram 6 Diagram 6 shows how the MO1G tries to compensate the lack of source power as a consequence of power generation decrease of MO1S wind turbine park The whole primary reserve of MO1G is 7 MW which is fully activated at 0 5 Hz frequency deviation The primary control effect is not instantaneously limited by the gas turbine control dynamics After reaching the primary control MW limit the frequency of the island collapsed Because of frequency sensitivity of loads about 8MW wind power generation decrease is possible to correspond to the frequency criteria The built in power of the grid is 56 MW so the grid is able to compensate almost 15 of the full built in power The simulation process was the following the system operates at steady state From t 1 sec the generated power was reduced on the MO1S bus in each second by 0 5MW Diagram 7 In diagram 7 as a consequence of increasing wind power generation the frequency is rising In case of 2 MW generated power increase up to 100 load of machines the frequency will change by 281 mHz The next examination was to reduce the consumption by 0 5 MW sec The full reserve capacity of MO1G was utilized 7 MW referring to initial state and the frequency change was almost 1 1 1Hz This indicates that our grid s robustness is good Diagram 8 Diagram 9 The third type of simulations in this chapter is fault analysis 1 G sc and 3 sc were simulated The 1 G sc s clearing time is 0 3 sec afterwards the failure phase is switched off till 1 sec and the normal operation is back The 3 sc s clearing time is 0 2 sec Three parameters were observed generator frequency system frequency and bus voltages These diagrams are in the Appendix Diagram 10 15 18 19 C Reclosing the grid to the large network During these examinations it was observed how it is possible to switch back the grid to the large network How the system frequency responds and how it is possible to set back the cooperation operation Firstly both systems were in steady state operation As next step it was attempted to find out the maximum amount of generation change when it is possible to reclose the grid to the interconnected network It is amazing as in an extreme 10MW load change situation it was possible to switch back Diagram 17 In island operation the power was increased in the grid by 10 MW so the frequency falls down to 48 25 Hz After this it was possible to make the back switch 4 Authorized licensed use limited to NORTH CHINA ELECTRIC POWER UNIVERSITY Downloaded on June 03 2010 at 02 04 41 UTC from IEEE Xplore Restrictions apply Diagram 16 Diagram 17 V SUMMARY Summarizing the main results A simulation model was established that is very similar to a part of the Hungarian power system This area is capable for island operation this way it is convenient to be examined as a smart grid The examinations after model creation can be divided into three main groups 1 island operation vs cooperating operation 2 voltage conditions 3 frequency limits of island operation Conclusion the wind power plant in the model increases the stability of the system if the grid operates synchronously with the interconnected system the voltage conditions of the concerned busses are not worse the modelled smart grid has great tolerance limit in respect of generation change consumption change and network faults VI REFERENCES 1 Technical And Economic Feasibility of Microgrid Based Power Systems Phil Barker Doug Herman Seventh EPRI Distributed Resources Conference and Exhibition Dallas TX March 20 22 2002 2 Daniel Kirschen Towards Decentralised Power Systems ECCE meeting in Bruxels oct 2003 3 Khaled A Nigim Wei Jen Lee Micro Grid Integration Opportunities and Challenges IEEE 2007 General Meeting Tampa USA 24 28 June 2007 4 A Faludi L Szabo Power System Operation and Control Hungarian Lecture notes on vet bme hu okt foszak ver veri index htm Budapest 2002 VII BIOGRAPHY Istvan Vokony was born in Mosonmagyarovar in Hungary on October 19 1983 He graduated at Revai Miklos grammar school in Gyor and studied at the Budapest University of Technology and Economics Faculty of Electrical Engineering and Informatics Department of Electric Power Engineering He is PhD student at Budapest University of Technology and Economics Faculty of Energetic and Electrotechnics He is member of the Hungarian Electrotechnical Association and the BUTE Student Association of Energy Andras Dan Dr is Professor with the Department of Electric Power Engineering Budapest University of Technology and Economics He received M Sc degree from Budapest Technical University in 1966 Ph D and D Sc degrees in Electrical Engineering from the Academy of Sciences in 1983 and 2005 respectively His expertise is in power electronics power quality and reactive power compensation especially associated with power system harmonics 5 Authorized licensed use limited to NORTH CHINA ELECTRIC POWER UNIVERSITY Downloaded on June 03 2010 at 02 04 41 UTC from IEEE Xplore Restrictions apply VIII APPENDIX Diagram 10 Diagram 11 Diagram 12 Diagram 13 Diagram 14 Diagram 15 6 Authorized licensed use limited to NORTH CHINA ELECTRIC POWER UNIVERSITY Downloaded on June 03 2010 at 02 04 41 UTC from IEEE Xplore Restrictions apply Diagram 18 Diagram 19 7 Authorized licensed use limited to NORTH CHINA ELECTRIC POWER UNIVERSITY Downloaded on June 03 2010 at 02 04 41 UTC from IEEE Xplore Restrictions apply
收藏
編號(hào):3971940
類型:共享資源
大?。?span id="zhjt75f" class="font-tahoma">2.59MB
格式:ZIP
上傳時(shí)間:2019-12-27
30
積分
- 關(guān) 鍵 詞:
-
kv
地區(qū)
變電所
電氣
一次
系統(tǒng)
設(shè)計(jì)
03
- 資源描述:
-
220kV地區(qū)變電所電氣一次系統(tǒng)設(shè)計(jì)03,kv,地區(qū),變電所,電氣,一次,系統(tǒng),設(shè)計(jì),03
展開(kāi)閱讀全文
- 溫馨提示:
1: 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
裝配圖網(wǎng)所有資源均是用戶自行上傳分享,僅供網(wǎng)友學(xué)習(xí)交流,未經(jīng)上傳用戶書面授權(quán),請(qǐng)勿作他用。