墊片沖壓模具設(shè)計(jì)
《墊片沖壓模具設(shè)計(jì)》由會(huì)員分享,可在線閱讀,更多相關(guān)《墊片沖壓模具設(shè)計(jì)(19頁(yè)珍藏版)》請(qǐng)?jiān)谘b配圖網(wǎng)上搜索。
1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit
2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,
3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi
4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail
5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the
6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi
7、lized. During the inspection, do not meet the environmental requirements of the "three" (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no fr
8、ee air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt
9、 into other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water
10、at all times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine mat
11、erialWe will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role
12、of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication "zero re
13、sistance". To constantly perfect ERP, and BFS++, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistan
14、t role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS++, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure "zero."
15、 To strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization ca
16、reer health medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that
17、 the business of "zero risk". To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, acti
18、ve should; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. T
19、o further standardize trading, and strive to achieve "according to law, standardize and fair." Innovation of performance management, to ensure that potential employees "zero fly". To strengthen performance management, process control, enhance employee evaluation and levels of effective communication
20、 to improve performance management. To further quantify and refine employee standards ... Work, full play party, and branch, and members in "five type Enterprise" construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening "four good" leadership
21、 construction, full play levels cadres in enterprise development in the 模具課程設(shè)計(jì)計(jì)算說(shuō)明書 設(shè)計(jì)課題:墊片沖孔落料級(jí)進(jìn)模具的設(shè)計(jì) 系部:機(jī)械工程技術(shù)系 班級(jí): 模 具1121 姓名: 李 佳 林 學(xué)號(hào): 2011554218 組別及序號(hào): 4-3 指導(dǎo)教師: 王 鑫 鋁 完成時(shí)間:2013年5月1日 學(xué)校:常州工程職業(yè)技術(shù)學(xué)院 前言 沖壓加工作為一種零件成型工藝技術(shù),在產(chǎn)品制造中應(yīng)用相當(dāng)?shù)膹V泛。全世界的鋼材,有60%~70%是板材,其中
22、大部分是經(jīng)過(guò)沖壓制成產(chǎn)品的。在沖壓加工中,沖壓工藝與模具的合理性和先進(jìn)性決定了沖壓產(chǎn)品的質(zhì)量和沖壓加工的經(jīng)濟(jì)性。國(guó)內(nèi)模具技術(shù)水平正飛速的發(fā)展,隨著沖壓工藝與模具技術(shù)的深入研究和發(fā)展,新技術(shù)、新工藝得到了大量的應(yīng)用。 在模具行業(yè)中,級(jí)進(jìn)模(也叫連續(xù)模)由多個(gè)工位組成,各工位按順序關(guān)聯(lián)完成不同的加工,在沖床的一次行程中完成一系列的不同的沖壓加工。一次行程完成后,由沖床送料機(jī)按照一個(gè)固定的步距將材料向前移動(dòng),這樣在一副模具上就可以完成多個(gè)工序,一般有沖孔,落料,折彎,切邊,拉伸等等。 通過(guò)本次設(shè)計(jì)的級(jí)進(jìn)模具,可以鞏固模具理論知識(shí),訓(xùn)練我的設(shè)計(jì)能力、創(chuàng)新能力、知識(shí)綜合應(yīng)用能力,全面提高我的綜合素質(zhì)
23、。在本設(shè)計(jì)報(bào)告中,可以清晰的看到每次設(shè)計(jì)的步驟和結(jié)果,不斷地討論和學(xué)習(xí),給我的級(jí)進(jìn)模具的設(shè)計(jì)帶來(lái)了很大的幫助。全面的設(shè)計(jì)都有自己的不斷努力的結(jié)果,相信在今后的設(shè)計(jì)中,能夠給自己更大的幫助。 本設(shè)計(jì)報(bào)告中有系統(tǒng)的模具設(shè)計(jì)要點(diǎn)、完整的典型模具設(shè)計(jì)、充足的設(shè)計(jì)步驟、清晰的設(shè)計(jì)繪圖技巧、一定的設(shè)計(jì)資料的查詢,可方便學(xué)者依據(jù)自己的知識(shí)基礎(chǔ)和興趣在不同的資料中查找到相關(guān)的理論。本設(shè)計(jì)也采用了合適的設(shè)計(jì)手段完成一套模具設(shè)計(jì)。本設(shè)計(jì)報(bào)告內(nèi)容淺顯易懂,圖文并茂,既有簡(jiǎn)單的理論指導(dǎo),又有實(shí)用性。 由于時(shí)間倉(cāng)促、水平有限,本設(shè)計(jì)報(bào)告中難免出現(xiàn)紕漏和錯(cuò)誤,敬請(qǐng)讀者批評(píng)指正,不勝感激。 目錄
24、 一、 沖壓件 …………………………………………………………… 4 二、 成形工藝分析 …………………………………………………… 4 三、 沖壓模具總體的相關(guān)設(shè)計(jì) …………………………… 5 1. 排樣設(shè)計(jì) …………………………………………… 5 2. 材料利用率 …………………………………………… 6 3. 沖壓力的計(jì)算 …………………………………………… 6 4. 壓力中心的確定 …………………………………………… 7 5. 工作零件刃口尺寸的計(jì)算 …………………………………… 7 6. 沖裁模具主要零部件的結(jié)構(gòu)設(shè)計(jì) ………………………
25、…… 9 7. 設(shè)計(jì)和選用卸料板及卸料螺釘 …………………………… 11 8. 橡膠彈性元件的選用及計(jì)算 …………………………… 13 9. 選擇模架及其他模具零件 …………………………… 13 四、 壓力機(jī)的校核 …………………………………………………… 15 五、 級(jí)進(jìn)模具的總裝配圖 …………………………………………… 16 六、 總結(jié) …………………………………………………………… 18 七、 參考文獻(xiàn) …………………………………………………………… 19 一、 沖壓件 沖壓件圖如下所示: 沖壓技術(shù)要求:
26、 1、 材料:08鋼 2、料厚:t=10.15mm 3、生產(chǎn)批量:中批量 二、 成型工藝分析 墊圈的沖裁件產(chǎn)品見(jiàn)任務(wù)書所示,墊圈的技術(shù)要求為:材料為08鋼。厚度為t=10.15mm。外圈的直徑為25mm,內(nèi)孔的直徑為8mm,其余的尺寸按為注公差等級(jí)IT14設(shè)置。 根據(jù)墊圈零件的結(jié)構(gòu)特點(diǎn),零件的沖裁成型工藝包括沖孔和落料兩個(gè)基本工序,可以采用單工序形式,也可以采用復(fù)合工序的形式,以及連續(xù)模具的工序形式。具體的工藝方案如下: 方案一:先落料,后沖孔,單工序模具結(jié)構(gòu)形式。 方案二:落料和沖孔同時(shí)進(jìn)行。復(fù)合模具結(jié)構(gòu)形式。 方案三:先沖孔、后落料的連續(xù)模具結(jié)構(gòu)形式。 三種方案中,單工序
27、模具結(jié)構(gòu)簡(jiǎn)單,工藝相對(duì)簡(jiǎn)單,制造成本低,易于加工和模具的維修,但需要使用兩幅模具,也適用于小批量或試制件生產(chǎn)。其中所需工藝力相對(duì)較小,易于保證零件的精度,單個(gè)模具的制造成本低,但會(huì)導(dǎo)致綜合工序的模具數(shù)量過(guò)多,生產(chǎn)分序過(guò)多而導(dǎo)致總成本增加,降低生產(chǎn)率。級(jí)進(jìn)模具(也叫連續(xù)模具)由多個(gè)工位組成,各工位按順序并聯(lián)完成不同的加工,在沖床上的一次行程中完成一系列的不同的沖壓加工,一次行程完成以后,由沖床送料機(jī)按照一個(gè)固定的步距將材料向前移動(dòng),這樣在一副模具中就可以完成多個(gè)工序,具有很高的生產(chǎn)效率。同時(shí),級(jí)進(jìn)模具操作安全,易于實(shí)現(xiàn)自動(dòng)化,減少?zèng)_床場(chǎng)地面積,減少半成品的運(yùn)輸和倉(cāng)庫(kù)占用等。復(fù)合模具可以把落料和沖
28、孔兩個(gè)工序組合在一副模具上,一次性完成沖裁。但在模具零部件加工制造上比較的困難,成本較高。并且凹凸模容易受到最小壁厚的限制,而使得一些內(nèi)孔間距、內(nèi)孔與邊緣間距較小的下件不宜采用。根據(jù)墊圈的生產(chǎn)批量,材料的厚度,尺寸的精度要求等,選擇使用級(jí)進(jìn)模具比較的合理。其模具結(jié)構(gòu)成本都比較的合適,以墊圈級(jí)進(jìn)模具為載體的項(xiàng)目較為全面的將沖裁基礎(chǔ)知識(shí)進(jìn)行了應(yīng)用。合理的組合了項(xiàng)目理論知識(shí)并基于級(jí)進(jìn)模具的結(jié)構(gòu),學(xué)習(xí)單工序的沖孔、落料模具知識(shí)。 三、沖壓模具總體的相關(guān)設(shè)計(jì) 1、排樣設(shè)計(jì) 設(shè)在先沖孔后落料的級(jí)進(jìn)模具時(shí),要先進(jìn)行條料的排樣圖設(shè)計(jì)。根據(jù)安裝板工件的結(jié)構(gòu)形狀,可采用下圖所示的排樣方法。由于08鋼為及軟的
29、碳素鋼,強(qiáng)度、硬度很低。而韌性和塑性極高,但存在時(shí)效敏感性,淬硬性極低,同時(shí)考慮生產(chǎn)用原材料條料的取值特點(diǎn): 條料的寬度B=D+2a=(25+2x1.5)mm=28mm 其中:B為條料寬度的基本尺寸;D為條料寬度方向零件輪廓的最大尺寸;a為側(cè)搭邊值,查表1-11搭邊最小值可得。 模具的結(jié)構(gòu)采用有側(cè)壓裝置進(jìn)行送料,選取工件與條料之間的搭邊值為1.5mm,沖裁件之間的搭邊值為1mm(因?yàn)闆_小孔時(shí),凸模易折斷,間隙應(yīng)取大值)。 2、材料利用率 η=A/(BS)100%=60.5% 其中:A為一個(gè)步距內(nèi)沖裁件的實(shí)際面積;S為送料步距(相鄰兩個(gè)沖裁件對(duì)應(yīng)點(diǎn)之間的距離);B為條料的寬度。
30、 3、沖壓力的計(jì)算 該模具采用級(jí)進(jìn)模具結(jié)構(gòu),采用彈性卸料、打桿出件的結(jié)構(gòu)形式,沖裁力的相關(guān)計(jì)算如下: (1) 沖裁力:F=KLtτ=1.3(25+8)3.140.9360N≈43.6KN k為系數(shù)1.3;L為沖裁件的周邊長(zhǎng)度,即刃口周長(zhǎng)(mm);t為材料的厚度;τ為材料的抗剪強(qiáng)度(MPa),查表1-1可得。 (2) 卸料力:FX=KXF=0.0443.6≈1.7KN (3) 推薦力:FT=KT F=0.0543.6≈2.2KN (4) 頂件力:Fd=KdF=0.0643.6≈2.6KN 其中KX、KT、Kd表示系數(shù),其值查表1-14可得。 因?yàn)椴捎脧椥孕读涎b置和下出料方式,壓力
31、機(jī)的公稱壓力Fz=F+Fx+Ft=47.6KN. 在上述計(jì)算中,沖裁力計(jì)算公式中的L值為落料周邊的刃口長(zhǎng)度與兩個(gè)沖孔刃口周邊的總和,同時(shí)依據(jù)計(jì)算出的沖裁力并結(jié)合模具結(jié)構(gòu)及外形尺寸,初選壓力機(jī)設(shè)備為J23-6.3。其主要工藝參數(shù)如下: 最大壓力為63KN,滑塊行程35mm,最大閉合高度150mm,閉合高度調(diào)節(jié)量35mm,工作臺(tái)尺寸(前后左右)200mm310mm,模柄尺寸¢2540mm。 壓力機(jī)的選擇依據(jù)《模具課程設(shè)計(jì)指導(dǎo)》P118-5.12冷沖壓成型常用設(shè)備選取。 4、壓力中心的確定 墊圈零件為對(duì)稱性的規(guī)則形狀,其級(jí)進(jìn)模具中的刃口形狀,所以,模具的沖裁壓力中心與幾何中心重合。 5、
32、工作零件刃口尺寸的計(jì)算 在進(jìn)行零件刃口計(jì)算之前,先要考慮工作零件的加工方法及模具的裝配方法。根據(jù)模具結(jié)構(gòu)及產(chǎn)品的生產(chǎn)情況,比較合適采用配合加工的制造方法,這樣易于保證沖裁的刃口間隙,降低制造成本,簡(jiǎn)化模具裝配工作,所以工作零件的刃口尺寸按照配合加工的方法進(jìn)行計(jì)算。安裝板級(jí)進(jìn)模具的刃口零件主要尺寸計(jì)算(單位:mm)如下: 根據(jù)圖樣尺寸的精度和技術(shù)要求,因?yàn)閳D中未標(biāo)注尺寸公差,所以都選用IT14,查《互換性與測(cè)量技術(shù)》可得到以下結(jié)果: 基本尺寸/mm 標(biāo)準(zhǔn)公差等級(jí) IT6 IT7 大于 至 um 6 10 9 15 18 30 13 21 其中,凸模
33、的設(shè)計(jì)按IT6,凹模的設(shè)計(jì)按IT7選用,零件的主要尺寸為:¢250.26mm,¢80.18mm。凹凸模刃口尺寸計(jì)算中X=0.5,因?yàn)闆_裁件的公差等級(jí)低于IT14或小批量生產(chǎn)時(shí),取X=0.5。 由于安裝板材料的塑性較大,材質(zhì)偏軟,結(jié)合經(jīng)驗(yàn)考慮,刃口間隙值取12.5%t=0.225mm,通常刃口間隙的經(jīng)驗(yàn)值取值范圍為(10%~12.5%)t,該間隙查閱資料《沖壓成型工藝與模具設(shè)計(jì)》可得:當(dāng)t=0.9mm時(shí),Zmax=0.126mm,Zmin=0.09mm,所以符合模具的設(shè)計(jì)要求。 1) 對(duì)于落料的公稱尺寸 Dd=(Dmax-X△)=(25.26-0.50.52)=25mm,上偏差為+0.02
34、1mm,下偏差為0; Dp=(Dd-Zmax)=(25-0.090)=24.91mm,上偏差為0,下偏差為-0.013mm。 經(jīng)∣£p∣+∣£d∣≤Zmax-Zmin校核,滿足模具的設(shè)計(jì)要求。 2) 對(duì)于沖孔的公稱尺寸 dp=(dmin+X△)=(7.92+0.50.36)=8mm; dd=(dp+Zmin)=(8+0.09)=8.09mm。 經(jīng)∣£p∣+∣£d∣≤Zmax-Zmin校核,滿足模具的設(shè)計(jì)要求。 6、沖裁模具主要零部件的結(jié)構(gòu)設(shè)計(jì) 工作零件的設(shè)計(jì) (1) 凸模結(jié)構(gòu)設(shè)計(jì) 凸模的結(jié)構(gòu)設(shè)計(jì)形式主要由沖裁件的形狀、尺寸及加工工藝等條件決定,凸模刃口截面輪廓形狀通常為規(guī)則
35、和不規(guī)則的,其結(jié)構(gòu)形式有整體式,鑲拼式,臺(tái)肩式,直通式和護(hù)套式等。由于凸模直接成型產(chǎn)品零件,所以凸模本身有較高的加工精度要求,其與固定板安裝通常采用H7/m6的過(guò)度配合或較小的間隙配合形式。 1) 沖孔凸模(臺(tái)肩式凸模) h1=12為凸模固定板的厚度;h2=12為卸料板的厚度;h3=8為到料板的厚度;h=15為附加長(zhǎng)度,包括凸模的修磨量,凸模進(jìn)入凹模的深度及凸模固定板與卸料板間的安全距離,一般為15~30mm。 查閱相關(guān)資料可知:h1=(60%~80%)H;h2=(80%~100%)H; h3取6~8mm。H為凹模的設(shè)計(jì)。 ¢d=8mm;¢D1=¢d+(3~5)=12mm;¢D=
36、¢D1+(3~5)=16mm。 2) 落料凸模:¢d=25mm;¢D1=29mm;¢D=33mm。 (2) 凹模結(jié)構(gòu)設(shè)計(jì) 沖裁時(shí)凹模受沖裁力和側(cè)向擠壓力的作用,由于凹模各結(jié)構(gòu)形式的固定方法不同,受力情況又比較的復(fù)雜,目前還不能用理論方法確定凹模的輪廓尺寸。 查表1-18(系數(shù)k值)可得:k=0.35mm a、 凹模的厚度H(≥15mm)=kb1=250.35=8.75mm,所以H=15mm。 其中b1為凹模寬度方向上刃口孔壁間的最大距離。 b、 凹模寬度B的計(jì)算公式為 B=b1+(2.5~4)H=25+315=70mm c、 凹模長(zhǎng)度L的計(jì)算公式為 L=L1+2C=34+2
37、22=78mm。 其中L1為凹模長(zhǎng)度方向刃口孔壁間的最大間隙;C為凹模長(zhǎng)度方向上孔壁間與凹模邊緣最小,可查表1-19凹??妆谥吝吘壍木嚯x得C=22mm。 凹模結(jié)構(gòu)如下圖: (3)、擋料銷的設(shè)計(jì) 擋料銷起定位作用,用它擋住搭邊或沖裁件輪廓以限定條料送進(jìn)距離。查表1-23(固定擋料銷)可得基本尺寸: 7、設(shè)計(jì)和選用卸料板及卸料螺釘 (1) 卸料板:卸料以卸料板卸料,固定卸料板的平面尺寸一般與凹模板相同,其厚度由上面的設(shè)計(jì)可得h2=12mm,固定卸料板的卸料力大,卸料可靠。根據(jù)以上信息可設(shè)計(jì)得出卸料板的結(jié)構(gòu)如下圖所示: (2) 卸料螺釘:選用45鋼,熱處理硬度HRC
38、35~40的圓柱內(nèi)六角卸料螺釘,卸料板上設(shè)置4個(gè)卸料螺釘,公稱直徑為¢8mm,卸料釘尾部應(yīng)留有足夠的行程空間,卸料螺釘擰緊后應(yīng)使卸料板超出凹模端面1mm,有誤差時(shí)通過(guò)在螺釘與卸料板之間安裝墊片來(lái)調(diào)整。 8、橡膠彈性元件的選用及計(jì)算 橡膠的壓縮量不能過(guò)大,否則會(huì)影響其壓力和壽命。 壓縮量L=L工作+L修磨mm=1+7mm=8mm。其中,L工作為卸料板的工作行程,L修磨為凸??傂弈チ?,一般取5~10mm。 橡膠的厚度H=L/(0.25~0.3)mm=29mm。(取0.25~0.3得平均值0.275) 9、選擇模架及其它模具零件 (1) 選擇模架: 根據(jù)GB/T2861.5-90,
39、由凹模周界78mm70mm,厚度15mm,及安裝要求,選取凹模周界:LB=(8080)mm,閉合高度H=125mm~145mm,上模座:(808030)mm,下模座:(808040)mm,導(dǎo)柱:(3280)mm,導(dǎo)套(324050)mm。 由以上可得模架如下圖所示: (2) 模柄: 由于壓力機(jī)的型號(hào)J23-6.3。可查的模柄孔的直徑為¢30,深度為55,根據(jù)裝配的要求,模柄與模柄孔的配合為H7/m6的過(guò)渡配合并加防轉(zhuǎn)銷釘,模柄長(zhǎng)度比模柄孔深度小5~10mm,由于采用固定卸料裝置,上模座回程時(shí)受力較大,因此選用壓入式模柄比較的合理,所以根據(jù)《模具零件材料及熱處理的選用》可查的模柄的
40、結(jié)構(gòu)設(shè)計(jì)如下圖所示: (3) 墊板: 墊板的作用是承受并擴(kuò)散凸模傳遞的壓力,以防止模座被擠壓損傷,因此在與模座接觸面之間加上一塊淬硬磨平的墊板。墊板的外形尺寸與凸模固定板相同,厚度可取3~10mm,此處設(shè)計(jì)選取規(guī)格為L(zhǎng)BH=78mm70mm8mm; (4) 凸模固定板: 凸模固定板的外形尺寸與凸模的外形尺寸一致,厚度為12mm,選取的規(guī)格為L(zhǎng)BH=78mm70mm12mm。 四、壓力機(jī)的校核 (1) 公稱壓力 根據(jù)公稱壓力選取的壓力機(jī)型號(hào)為J23-6.3,它的壓力為 63KN〉Fz=47.6KN.所以壓力得以校核; (2) 閉合高度 由于壓力機(jī)型號(hào)可得Hmax=
41、150mm,M=35mm,H1=30mm Hmin=Hmax-M=150mm-35mm=115mm。(M為閉合高度的調(diào)節(jié)量;H1為墊板的厚度,可查表開(kāi)式雙柱可傾壓力機(jī)技術(shù)規(guī)格得到);根據(jù)GB/T 2851.3-90得模具的閉合高度為105mm≤H≤130mm,根據(jù)公稱壓力選用的壓力機(jī)比和高度為115mm≤H≤150mm,H墊=30mm,因?yàn)镠min+10mm≤H≤Hmax-5mm,即:125mm ≤H≤ 145mm,所以H=129mm,選預(yù)定壓力機(jī)J23-6.3符合要求。 H=H上+H下+H凹+H凸+H墊-18=30mm+40mm+47mm+30mm-18=129mm。 五、根據(jù)以上的設(shè)
42、計(jì)分析,可以得出級(jí)進(jìn)模具的總裝配圖 1、 內(nèi)六角螺釘 2、 墊板 3、圓柱銷 4、內(nèi)六角螺釘 5、下模座 6、 橡膠7、圓柱銷8、卸料板9、凸模固定板10、上模座 11、墊板12、落料凸模13、模柄14、打桿15、內(nèi)六角螺釘16、打料板 17、沖孔凸模18、導(dǎo)套19、墊板20、凹模21、導(dǎo)柱 總結(jié) 項(xiàng)目化的教育給我最大的觸動(dòng)就是我能夠通過(guò)自己的努力去設(shè)計(jì)一套完整的工藝裝備。在這里,能夠找到自己的自信,同時(shí),項(xiàng)目化的
43、教育是一個(gè)很好的展現(xiàn)自我的平臺(tái)。 針對(duì)本次的沖壓模具設(shè)計(jì),我深刻體會(huì)到設(shè)計(jì)其中隱含的困惑與疑慮。而這些的問(wèn)題都要靠自己去查取相關(guān)的知識(shí)與理論,這不僅開(kāi)拓我的知識(shí)面,也增強(qiáng)了我的動(dòng)手能力和思維能力。圖表的識(shí)別是非常的重要,因?yàn)槠渲泻枚嗟牧悴考际菄?guó)家標(biāo)準(zhǔn)的,不需要過(guò)多的設(shè)計(jì)。這樣,自己的讀圖能力就必需要好。 一分耕耘一分收獲,沒(méi)有徒勞而獲的好事。雖然說(shuō)本次的設(shè)計(jì),每個(gè)人的數(shù)據(jù)都是大不相同的,但是方法都是類似,結(jié)果的交流也是很有必要的。比如,當(dāng)某個(gè)設(shè)計(jì)步驟不太清楚地時(shí)候,組員之間可以相互的進(jìn)行溝通交流,或者通過(guò)對(duì)老師的咨詢來(lái)解決疑難問(wèn)題。讓自己能夠得到更好地發(fā)展。所以,學(xué)習(xí),重要的是學(xué)習(xí)它的方
44、式方法,懂得其中,鍛煉思維創(chuàng)新能力,而不是簡(jiǎn)單的照本宣科。 對(duì)我來(lái)說(shuō),設(shè)計(jì)是我很大的興趣。每當(dāng)通過(guò)一次的設(shè)計(jì),我都能夠找到其中的設(shè)計(jì),無(wú)形之中,計(jì)算、查閱、分析等等各方面的能力就得到了提升。此次的設(shè)計(jì)是我走向未來(lái)工作的重要一步,從最初的選題、開(kāi)題到計(jì)算、繪圖直到完成設(shè)計(jì),期間查找資料、老師們的指導(dǎo)與同學(xué)的交流,每一個(gè)過(guò)程都是對(duì)自己能力的一次檢驗(yàn)和充實(shí)。不但使我更進(jìn)一步理解和懂得了以前學(xué)到的知識(shí)而且還把以前課本上學(xué)到的知識(shí)連接在了一起。使我能更好的融會(huì)貫通。 相信在今后的設(shè)計(jì)中能夠更好地展現(xiàn)自己的才華。 參考文獻(xiàn) [1] 袁小江,劉進(jìn)明.沖壓模具設(shè)計(jì)項(xiàng)目教程[M].北京:機(jī)械
45、工業(yè)出版社,2012. [2] 梅伶.模具課程設(shè)計(jì)指導(dǎo)[M].北京:機(jī)械工業(yè)出版社,2006. [3] 王姣,邵娟琴.工程制圖[M].北京:化學(xué)工業(yè)出版社,2011. [4] 武海濱等.AutoCAD2004實(shí)訓(xùn)教程[M].北京:化學(xué)工業(yè)出版社,2006. [5] 熊建武.模具零件材料與熱處理的選用[M].北京:化學(xué)工業(yè)出版社,2011. [6] 陳傳勝?zèng)_壓成型工藝與模具設(shè)計(jì)[M].北京:化學(xué)工業(yè)出版社,2012. [7] 周文玲.互換性與測(cè)量技術(shù)[M].北京:機(jī)械工業(yè)出版社,2005. [8] 王信友.沖壓工藝與模具設(shè)計(jì)[M].北京:清華大學(xué)出版社,2010. recov
46、ery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emitted b
47、y construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers, opera
48、tors, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the living en
49、vironment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 daily by
50、the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the cons
51、truction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civilized
52、. During the inspection, do not meet the environmental requirements of the "three" (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free ai
53、r dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt into
54、 other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al
55、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material
56、of backbone backbone role; to full strengthening members youth work, full play youth employees in company development in the of force role; to improve independent Commission against corruption work level, strengthening on enterprise business key link of effectiveness monitored. , And maintain stabil
57、ity. To further strengthen publicity and education, improve the overall legal system. We must strengthen safety management, establish and improve the education, supervision, and evaluation as one of the traffic safety management mechanism. To conscientiously sum up the Olympic security controls,
58、promoting integrated management to a higher level, higher standards, a higher level of development. Employees, today is lunar calendar on December 24, the ox Bell is about to ring, at this time of year, we clearly feel the pulse of the XX power generation company to flourish, to more clearly hear XX
59、 power generation companies mature and symmetry breathing. Recalling past one another across a railing, we are enthusiastic and full of confidence. Future development opportunities, we more exciting fight more spirited. Employees, let us together across 2013 full of challenges and opportunities, to create a green, low-cost operation, full of humane care of a world-class power generation company and work hard! The occasion of the Spring Festival, my sincere wish that you and the families of the staff in the new year, good health, happy, happy19
- 溫馨提示:
1: 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 市教育局冬季運(yùn)動(dòng)會(huì)安全工作預(yù)案
- 2024年秋季《思想道德與法治》大作業(yè)及答案3套試卷
- 2024年教師年度考核表個(gè)人工作總結(jié)(可編輯)
- 2024年xx村兩委涉案資金退還保證書
- 2024年憲法宣傳周活動(dòng)總結(jié)+在機(jī)關(guān)“弘揚(yáng)憲法精神推動(dòng)發(fā)改工作高質(zhì)量發(fā)展”專題宣講報(bào)告會(huì)上的講話
- 2024年XX村合作社年報(bào)總結(jié)
- 2024-2025年秋季第一學(xué)期初中歷史上冊(cè)教研組工作總結(jié)
- 2024年小學(xué)高級(jí)教師年終工作總結(jié)匯報(bào)
- 2024-2025年秋季第一學(xué)期初中物理上冊(cè)教研組工作總結(jié)
- 2024年xx鎮(zhèn)交通年度總結(jié)
- 2024-2025年秋季第一學(xué)期小學(xué)語(yǔ)文教師工作總結(jié)
- 2024年XX村陳規(guī)陋習(xí)整治報(bào)告
- 2025年學(xué)校元旦迎新盛典活動(dòng)策劃方案
- 2024年學(xué)校周邊安全隱患自查報(bào)告
- 2024年XX鎮(zhèn)農(nóng)村規(guī)劃管控述職報(bào)告