歡迎來到裝配圖網(wǎng)! | 幫助中心 裝配圖網(wǎng)zhuangpeitu.com!
裝配圖網(wǎng)
ImageVerifierCode 換一換
首頁 裝配圖網(wǎng) > 資源分類 > DOC文檔下載  

冬季施工方案 - lnlh2003的日志 - 網(wǎng)易博客(Winter construction program - lnlh2003's log - NetEase blog)

  • 資源ID:73941060       資源大小:35.50KB        全文頁數(shù):12頁
  • 資源格式: DOC        下載積分:10積分
快捷下載 游客一鍵下載
會員登錄下載
微信登錄下載
三方登錄下載: 微信開放平臺登錄 支付寶登錄   QQ登錄   微博登錄  
二維碼
微信掃一掃登錄
下載資源需要10積分
郵箱/手機(jī):
溫馨提示:
用戶名和密碼都是您填寫的郵箱或者手機(jī)號,方便查詢和重復(fù)下載(系統(tǒng)自動生成)
支付方式: 支付寶    微信支付   
驗(yàn)證碼:   換一換

 
賬號:
密碼:
驗(yàn)證碼:   換一換
  忘記密碼?
    
友情提示
2、PDF文件下載后,可能會被瀏覽器默認(rèn)打開,此種情況可以點(diǎn)擊瀏覽器菜單,保存網(wǎng)頁到桌面,就可以正常下載了。
3、本站不支持迅雷下載,請使用電腦自帶的IE瀏覽器,或者360瀏覽器、谷歌瀏覽器下載即可。
4、本站資源下載后的文檔和圖紙-無水印,預(yù)覽文檔經(jīng)過壓縮,下載后原文更清晰。
5、試題試卷類文檔,如果標(biāo)題沒有明確說明有答案則都視為沒有答案,請知曉。

冬季施工方案 - lnlh2003的日志 - 網(wǎng)易博客(Winter construction program - lnlh2003's log - NetEase blog)

冬季施工方案 - lnlh2003的日志 - 網(wǎng)易博客(Winter construction program - lnlh2003's log - NetEase blog)Winter construction program - lnlh2003's Journal - NetEase blog, NetEase newsmicro-blogmailboxLightning mailAlbumadhere to principles of truth and rightMobile mailAn iconFantasyMore blogs, blogs, home pagesBlog topicHot topicsBlog rape landFind friendsBlogosphereBlog styleMobile BlogSMS bloggingMail writeBlog copy, photography, photography exhibition areaDaily topicsCharacter annalsInterviewHomework search blog search blog and take a look at this blog attention style no longer difficult to move to send Lomo card registration login display a close |Pile foundation slope supporting engineering real emotion virtual world virtual real self guided self governanceThe album music collection on my blog log log lnlh2003With the attention he.Latest logConstruction organization design, construction enterprise contract management, civil engineering quantity calculation rules, cited reference scaffolding construction program, gravel pile technical disclosure, eleven bloggers recommendRelated logsRandom readingRent both sad who knows? 10 beautiful coat jacket to help you withstand the cold wave of the Millennium 7 details to decipher whether men call? Crack "before dawn", the formation of word of mouth mystery, cool without losing styleDoes the pressure on the London Daren Street make your hair look white? Home recommendationMy husband took vocalizations when bask in Japanese food price customized ringing tone (Figure) around us to see Taiwanese male white-collar Li 'Han Hong' return to the mainland disaster on the road in a car accident hit kill more "Why College StudentsField inspection report on temporary power consumption schemeWinter construction program construction 2009-06-24 13:45:08 read 255 review 0: big and small subscriptions5, winter construction plan5.1 after winter, manual excavation of bored piles, construction conditions have changed the following:After 5.1.1 enters the winter, the temperature drops, the ground produces the frozen layer construction, the excavation difficulty increases.5.1.2 enters the water temperature is reduced after the winter, well point dewatering pipes, water supply pipe, water pump, easy of ice, cracking.When the 5.1.3 enters the winter construction, the construction efficiency is reduced.After entering the winter construction of 5.1.4, the construction will be stopped in case of bad weather. After the resumption of work, measures such as on-site cleaning and other measures should be taken.5.2, in order to ensure the quality of construction work, ensure safety in production and ensure the construction period, take the following winter construction measures.5.2.1 guarantee the construction quality measures of steel cage.The finished material and semi-finished material of the reinforcing steel bar should be piled up neatly, covered and laid in place to prevent the corrosion of the rebar due to the rain and snow. The cage shall be cleaned before the steel cage is hoisted. For semi-finished products, more cage, because of rain and snow and rust, rust removal work should be carried out in a timely manner. In the construction of reinforcing steel welding, when the ambient temperature is lower than 5 DEG C, the steel bar shall be welded by negative temperature welding of the steel bar, and the welder engaged in the welding of the steel bar must hold the certificate of steel welder examination. Safety technical measures shall be formulated and implemented to strengthen the labor protection of welders and prevent accidents such as burns, electric shocks and fires. Before welding the steel bar, the welding shall be carried out according to the construction conditions, and the welding can be carried out after qualified. The welder shall check the appearance quality of all joints after the welding, and reject the unqualified ones. When welding with negative temperature, the welding parameters should be adjusted so that the welding seam and heat affected zone can be cooled slowly. When winds exceed four, wind protection measures should be taken. After welding, the cold joint should be avoided to touch the ice and snow. Welding shall not be applied when ambient temperature is lower than 20 degrees centigrade.5.2.2 steel negative temperature arc welding5.2.2.1 scope: Steel less than 22mm in diameter with a welding5.2.2.2: j506, steel electrode selection5.2.3 preparation before weldingBefore welding, the rust, slag and oil contamination of the welding area of the reinforcing steel bar must be removed, and the distortion and bending of the end of the steel bar should be straightened or removed by 5.2.3.1.5.2.3.2 steel lap welding should use one side welding, can not carry out single side welding or double face welding.5.2.4 welding processAccording to the steel grade, diameter, joint type and welding position, welding current and electrode diameter selection, suitable welding, welding process should be adopted in multi temperature control, it is necessary to prevent cooling after welding speed is too fast, but also to prevent joint overheating. Welding process shall meet the following requirements:When welding, 5.2.41 shall be fixed at two points. Fixed by manual assistance, fixed, when the joint position is good after welding (ensure steel coaxial).5.2.4.2 welding, the arc should begin in the end of the lap bar, in the end should be reinforced lap arc crater shall be filled up.5.2.4.3 lap welding, the first layer of weld arc from the middle first, then to the ends of the arc. The first layer of pedlar shall have sufficient penetration, the main weld and weld positioning, especially in the beginning and terminal position of welding seam, should be good fusion. After each layer of welding seam welding, stratified temperature control welding. The interlayer temperature is controlled between 150 DEG C and 350 DEG C, so as to play a role of slow cooling.H the weld thickness of 5.2.4.4 lap joints shall be no less than 0.3 steel bars; the width of welds shall be no less than 0.7, and the diameter of the steel bars shall be no less than 6.5.2.4.5 grade reinforced bar joints of multilayer welding, the temper bead welding method ", namely: the final temper bead length than before the bead at both ends of the shortened 4 - 6mm.5.2.5 quality acceptance5.2.5.1 sampling: visual inspection shall be carried out separately or visually after the joint has been removed. Tensile test, from the appearance of qualified finished products, cut three specimens per batch for tensile test. Take a tensile test at each of the 300 joints5.2.5.2 visual inspection: visual inspection results, should meet the following requirements: the weld surface formation, no sag, large overlap. There must be no crack at the joint. The undercut depth, the number of holes, the amount of slag and the size deviation of the joint shall not exceed the specified value. The appearance of unqualified joints, after modification or reinforcement, can be submitted for the two acceptance.5.2.6 connector notesWhen the steel bar is welded, the welded joints arranged in the same steel cage shall be staggered. In the range of 35 times of the diameter of the reinforcing bar (no less than 500mm), a steel bar shall not have two joints, and the sectional area of the joint reinforcement shall be 50% of the total sectional area of the steel bar.5.3 ensure pore forming measures5.3.1 construction, for individual prone to collapse of the pile, the use of large displacement pumps, sedimentation tanks need to set up a shelter, as far as possible to avoid the precipitation pond icing.5.3.2 uses steam (hot water) heating method on water pipeline to ensure smooth and timely cleaning pipeline residual water and sediment suspension transitions. Prevent the pipe from freezing and cracking.5.4 ensure the quality of perfusion construction5.4.1 the construction site of the reasonable control of the concrete pouring speed, strictly control the construction process, coordinate the commercial concrete supply time, reduce or avoid the waiting time of the tanker with concrete, which taking concrete into the hole temperature meets the requirement.5.4.2 uses the hot water to the catheter and joints, threaded parts timely cleaning, prevent adhesion of ice, shorten the filling time. After the concrete is finished, the pipe is cleaned in time, and a special pipe rack is arranged on the spot. The pipe is sealed on the pipe rack to avoid the contact between the pipe and the ground mud.The 5.4.3 site pile pile buried below the surface (in Dalian, following the provisions of the deep freeze) into 24 piles of empty pile in time after backfilling, filling height of pile head height was 1.0m.5.4.4 site set up a person to do a daily temperature record.5.5 winter season guarantee measures5.5.1 construction site to take measures to keep people warm5.5.1.1 construction site will set up 3 movable rooms, with boilers for the on-site construction workers to take turns heating.The 5.5.1.2 of each worker issued coats, gloves, cotton padded cap, masks and other warm supplies.5.5.2 ensure manpower and equipment resources5.5.2.1 50% - 100% more during the winter construction site construction and management personnel involved in construction, ensure the construction efficiency.5.5.2.2 equipment operating units increased nuanpeng.5.5.2.3 construction of vulnerable parts, pipelines, tools must be in stock, the construction site pipeline leakage, timely replacement.5.5.2.4 machines ready to be put into site operation shall be replaced with fuel, hydraulic oil and lubricating oil suitable for use in winter before the start of operation. Regular inspection and maintenance of equipment shall be carried out to ensure the normal operation of the equipment.5.5.3 logistics support5.5.3.1 guarantee the supply of labor protection products during construction.5.5.3.2 improve staff food supply standards.5.5.3.3 staff quarters are equipped with heating facilities to purchase heating boilers.5.6 winter construction safety measures5.6.1 fire safety measures5.6.1.1 construction site and living area are strictly prohibited from private automatic fire.5.6.1.2 establish a winter fire safety leading group, responsibility to people at any time check, put an end to fire.5.6.1.3 formulate safety fire emergency plan, and site construction personnel safety education, clear fire emergency measures.5.6.1.4 construction site and living area to purchase fire equipment, safety education for the construction staff, the use of fire control facilities.5.6.1.5 oxygen, acetylene bottles and other flammable and explosive materials, away from fire storage.5.6.1.6 construction site and living area heating, fire, special care to prevent fire and carbon monoxide poisoning.5.6.2 construction site and living areas are prohibited unauthorized use of electrical heating.5.6.3 climbing and mechanical work before the construction of special arrangements to clean up the scene, the operating surface frost, snow and ice floes clean, you can carry out construction.5.6.4 regular inspection of equipment, found hidden trouble in a timely manner rectification.5.6.5 field wind over 5 stop lifting operation. 0 | share: reading (255) | comments (0) | references (0) | ReportField inspection report on temporary power consumption schemetoday in historyRelated articlesConstruction technology - reinforced concrete precast pile, reinforced concrete wall, column steel positioning construction method, automatic numerical control steel reinforcement construction technology, steel reinforcement length calculation conceptRecent readerAfter logging in, you can leave a footprint here. Sdzy8619 wyjdldz hskyshfy liuji010 ex2046 until the flowerscommentClick on the login | nickname:Cancel the verification code: change itPrevious page 1. -1-1-1-1-1-1-1. -1, next page footerCompany profile - contact method - Recruitment Information - customer service - related laws - blog style - Mobile Blog - subscribe to this blogNetEase Inc. All rights reserved; ? 1997-2010 * information tipsStyle control, have you made a difficult decision today? Mobile phone blogging, Word, blogging, LiveWriter, blogging

注意事項(xiàng)

本文(冬季施工方案 - lnlh2003的日志 - 網(wǎng)易博客(Winter construction program - lnlh2003's log - NetEase blog))為本站會員(ca****in)主動上傳,裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對上載內(nèi)容本身不做任何修改或編輯。 若此文所含內(nèi)容侵犯了您的版權(quán)或隱私,請立即通知裝配圖網(wǎng)(點(diǎn)擊聯(lián)系客服),我們立即給予刪除!

溫馨提示:如果因?yàn)榫W(wǎng)速或其他原因下載失敗請重新下載,重復(fù)下載不扣分。




關(guān)于我們 - 網(wǎng)站聲明 - 網(wǎng)站地圖 - 資源地圖 - 友情鏈接 - 網(wǎng)站客服 - 聯(lián)系我們

copyright@ 2023-2025  zhuangpeitu.com 裝配圖網(wǎng)版權(quán)所有   聯(lián)系電話:18123376007

備案號:ICP2024067431-1 川公網(wǎng)安備51140202000466號


本站為文檔C2C交易模式,即用戶上傳的文檔直接被用戶下載,本站只是中間服務(wù)平臺,本站所有文檔下載所得的收益歸上傳人(含作者)所有。裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對上載內(nèi)容本身不做任何修改或編輯。若文檔所含內(nèi)容侵犯了您的版權(quán)或隱私,請立即通知裝配圖網(wǎng),我們立即給予刪除!